2
1
Notes regarding safety ...............................................................................1
2
Operation of the screed ..............................................................................2
2.1
Extend/retract screed .................................................................................2
2.2
Adjusting the compacting elements - conventional version ........................4
Adjusting the tamper ..............................................................................4
Adjusting the vibration ............................................................................4
2.3
Adjusting the tamper - PLC version ............................................................5
Adjusting the vibration ............................................................................5
3
Operation of the gas heater system with flame monitoring ........................6
3.1
Schematic diagram of the gas supply system ............................................6
3.2
General notes on the gas heater system ...................................................7
3.3
Connection and leak test ............................................................................8
3.4
Commissioning and checking the heater ...................................................9
3.5
Exchanging the gas bottles ......................................................................10
4
Screed heater - conventional version .......................................................11
4.1
Switch cabinet for screed heater ..............................................................11
Ignition process ....................................................................................13
4.2
Function of the flame monitoring system ..................................................14
4.3
Switching off the heater ............................................................................16
5
Screed heater - PLC version ....................................................................17
5.1
Switch cabinet for screed heater ..............................................................17
5.2
Operating the control and monitoring unit ................................................19
Ignition process -
PLC version ..........................................................................................22
5.3
Function of the flame monitoring system ..................................................23
5.4
Temperature display, setting temperature level .......................................25
5.5
Temperature setting .................................................................................25
Energy saving mode / "Energy saving" ................................................26
5.6
Status and error messages ......................................................................27
Emergency programme with sensor error ............................................28
5.7
Switching off the heater ............................................................................29
6
Operating the electric heater ....................................................................30
6.1
Switch cabinet for screed heater ..............................................................30
6.2
Operating the control and monitoring unit ................................................32
6.3
General information on the heating system ..............................................35
Energy saving mode / "Energy saving" ................................................36
6.4
Insulation monitor .....................................................................................37
Insulation faults ....................................................................................38
6.5
Commissioning and checking the heater .................................................39
6.6
Temperature display, setting temperature level .......................................40
6.7
Temperature setting .................................................................................40
6.8
Status and error messages ......................................................................41
Emergency programme with sensor error ............................................42
6.9
Switching off the heater ............................................................................43
7
Malfunctions .............................................................................................44
7.1
Problems during paving ...........................................................................44
7.2
Malfunctions on the screed .....................................................................47
E
Set-up and modification .........................................................1
Summary of Contents for V5100TV
Page 2: ...www atlascopco com...
Page 20: ...A 2...
Page 30: ...B 10 5 Location of instruction labels and type plates 5 o 4 7 2 1 6 2 4 o 1 3...
Page 34: ...B 14...
Page 37: ...C 3 2 1 4 3...
Page 38: ...C 4...
Page 55: ...D 17 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 42 41 43 44...
Page 57: ...D 19 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 70: ...D 32 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 86: ...D 48...
Page 92: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 117: ...E 31 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 130: ...F 6 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 134: ...F 10 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 150: ...F 26...
Page 152: ...www atlascopco com...