F 2
2
Maintenance intervals – screed in general
Interval
Maintenance point
Note
10 / daily
50
100
250
500
1000 / annually
2000 / every 2 years
If necessary
q
-
Lubricate tamper/vibration
bearings
q
-
Lubricate tamper bearings of ex-
tension parts
q
-
Lubricate vibration bearings of ex-
tension parts
q
-
Lubricate guide tube bearings
q
-
Clean / oil guide tubes
After
work is fin-
ished
q
-
Lubricate crowning adjuster
q q
-
Adjust guide tube play
q
-
Check tamper deflector plate play
q
-
Adjust tamper deflector plate play
q
-
Hydraulic hoses -
Visual inspection
q q
-
Hydraulic hoses -
Replace hoses
q
-
Have screed checked by an expert
Maintenance
q
Maintenance during the running-in
period
g
Summary of Contents for V5100TV
Page 2: ...www atlascopco com...
Page 20: ...A 2...
Page 30: ...B 10 5 Location of instruction labels and type plates 5 o 4 7 2 1 6 2 4 o 1 3...
Page 34: ...B 14...
Page 37: ...C 3 2 1 4 3...
Page 38: ...C 4...
Page 55: ...D 17 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 42 41 43 44...
Page 57: ...D 19 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 70: ...D 32 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 86: ...D 48...
Page 92: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 117: ...E 31 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 130: ...F 6 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 134: ...F 10 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 150: ...F 26...
Page 152: ...www atlascopco com...