B 5
Levelling/slope control system:
The standard paver finisher is prepared electrically
and hydraulically to fit an automatic levelling system.
The levelling system monitors the paving thickness and corrects any deviations from
the nominal level automatically.
The system consists of optional combinations of:
- Height controllers
- Slope controller
- Digital controllers
The slope control system always operates in conjunction with the levelling cylinders
on the opposite side.
By adjusting the height of the traction point of the crossbeam, the paving thickness of
the material or the laying height of the screed can be controlled.
Actuation occurs electrohydraulically on both sides and can be controlled manually
by means of toggle switches or automatically by means of an electronic grade control
system.
Screed lifting device:
The screed lifting device is used to lift the screed during trans-
portation. This takes place by hydraulic means by actuating a hydraulic cylinder.
Summary of Contents for F1200C
Page 2: ...www dynapac com...
Page 10: ...8...
Page 24: ...A 2...
Page 31: ...B 7 4 Safety devices 4 5 6 7 8 8 2 1 9 3 10...
Page 34: ...B 10 5 2 Permissible approach angle max 15 max 10...
Page 41: ...B 17 xxxxxxxxxxxxxxxxx 32 30 31...
Page 52: ...B 28...
Page 74: ...C 10 12 22...
Page 78: ...D 10 12 4 15 16 18 14 13 17 12 11 10 10 19...
Page 80: ...D 10 12 6 15 16 18 14 13 17 12 11 10 10 19...
Page 82: ...D 10 12 8 15 16 18 14 13 17 12 11 10 10 19...
Page 84: ...D 10 12 10 21 20 23 22...
Page 86: ...D 10 12 12 25 24 27 26...
Page 88: ...D 10 12 14 25 24 27 26...
Page 90: ...D 10 12 16 29 30...
Page 92: ...D 10 12 18 32 31...
Page 94: ...D 10 12 20 33...
Page 96: ...D 10 12 22 35 34...
Page 98: ...D 10 12 24 36 38 37...
Page 100: ...D 10 12 26 40 39...
Page 102: ...D 10 12 28 42 41...
Page 104: ...D 10 12 30 44 43...
Page 106: ...D 10 12 32 45...
Page 108: ...D 10 12 34 51 56 58 57 59...
Page 110: ...D 10 12 36 51 56 58 57 59...
Page 112: ...D 10 12 38 Flame monitoring o 73 71 72 70...
Page 114: ...D 10 12 40 77 74 75 76...
Page 118: ...D 10 12 44 95 90 91 92 93 94...
Page 120: ...D 10 12 46 95 90 91 92 93 94...
Page 122: ...D 10 12 48 4 Remote control 103 104 101 106 100 102 105 107 108 109...
Page 124: ...D 10 12 50 103 104 101 106 100 102 105 107 108 109...
Page 126: ...D 10 12 52 103 104 101 106 100 102 105 107 108 109...
Page 128: ...D 10 12 54 103 104 101 106 100 102 105 107 108 109...
Page 130: ...D 10 12 56 5 Malfunctions 5 1 Error code query for engine 3 1 2...
Page 144: ...D 30 12 12 m Tighten all assembly parts properly after setting up...
Page 152: ...D 30 12 20...
Page 157: ...D 40 12 5 1 3 7 8 6 6 7 7 6 2 4 9 5...
Page 160: ...D 40 12 8 1 3 7 8 6 6 7 7 6 2 4 9 5...
Page 163: ...D 40 12 11 1 2...
Page 165: ...D 40 12 13 6 1 2 3 4 5...
Page 167: ...D 40 12 15 4 6 6 6 1 2 5 3...
Page 171: ...D 40 12 19 2 3 2 2 1 4...
Page 173: ...D 40 12 21 1 8 9 8 8 6 4 2 3 5 7 10 13 11 12...
Page 176: ...D 40 12 24 1 2...
Page 178: ...D 40 12 26 1 4 5 10 10 7 3 2 9 6 8 12 10 13 14 16 15 11 4 4 11 11...
Page 186: ...D 40 12 34...
Page 205: ...F 3 12 1 F 3 12 Maintenance conveyor 1 Maintenance conveyor...
Page 211: ...F 4 12 1 F 4 12 Maintenance auger assembly 1 Maintenance auger assembly...
Page 233: ...F 6 12 1 F 6 12 Maintenance hydraulic system 1 Maintenance hydraulic system...
Page 247: ...F 7 12 1 F 7 12 Maintenance drive unit 1 Maintenance drive unit...
Page 260: ...F 7 12 14...
Page 261: ...F 8 12 1 F 8 12 Maintenance electrical system 1 Maintenance electrical system...
Page 276: ...F 8 12 16...
Page 278: ...F 11 12 2 2 7 1 3 5 6 6 4...
Page 284: ...F 11 12 8...
Page 285: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping...
Page 294: ...F 100 10...
Page 296: ...www dynapac com...