29
Choose the band you are constructing and install the Wire Guide as shown below on a typical spreader
positioned vertically. These assemblies will be moved for final positioning on your antenna. Snug them in
place and do not tighten.
5-Band positions - Position depends on your band choice - Choose one
Mount the Single Band Insulator Center Feed Clamp Assembly on the vertical post in the position for the
chosen band. One end of the two Driven Element Wires is threaded through the wire guide clamps and
connected to the center feed. Route the wires through the center insulator in a serpentine manner as shown.