Appendix
G
29
Quickguide
Start-up
1
Close the isolating valve on the discharge side of the pump and
open the isolating valve on the suction side.
2
Remove the priming plug from the pump head and slowly fill the
pump with liquid. Replace the priming plug and tighten securely.
3
See the correct direction of rotation of the pump on the motor fan
cover.
4
Start the pump and check the direction of rotation.
5
Vent the pump by means of the vent valve in the pump head. At the
same time, open the discharge isolating valve a little.
6
Continue to vent the pump. At the same time, open the discharge
isolating valve a little more.
7
Close the vent valve when a steady stream of liquid runs out of it.
Completely open the discharge isolating valve.
8
For further information, see page
Summary of Contents for VT Booster Set
Page 1: ...VT Booster Set O M Manual...
Page 3: ...1 Important Health Safety Information Page 3 VT Booster Set...
Page 10: ...2 System Information Installation and Commissioning Page 10 VT Booster Set...
Page 11: ...2 1 Booster Set Components VT Booster Set Components Page 11 VT Booster Set...
Page 12: ...2 2 Control Panel Wiring Diagrams Twin Pump Wiring Diagram Single Phase Page 12 VT Booster Set...
Page 13: ...Twin Pump Wiring Diagram 3 Phase Page 13 VT Booster Set...
Page 15: ...VR VASCO Cold Water Booster Sets Page 15 VT Booster Set...
Page 16: ...VT3 Three Phase Control Panel Wiring Diagram Page 16 VT Booster Set...
Page 17: ...Page 16a VT Booster Set...
Page 23: ...3 User Maintenance and Troubleshooting Page 22 VT Booster Set...
Page 43: ...Appendix 14...
Page 50: ...Appendix 21...
Page 51: ...Appendix 22...
Page 55: ...Appendix 26...
Page 56: ...Appendix 27...