11
FIGURE 4-1 Clearance to Combustible Materials
TABLE 2: BOILER CLEARANCES
Dimension
Combustible
Materials
(1)
Service
(1)(2)
Model
Model 050/075/100/
150/200/299
050/075/100/
150/200/299
Top (A)
Top (A)
0" (0 cm)
14" (36 cm)
Left Side (B)
Left Side (B)
0" (0 cm)
0" (0 cm)
Right Side (C)
Right Side (C)
0" (0 cm)
0" (0 cm)
Front (D)
Front (D)
0" (0 cm)
6" (16 cm)
Back (E)
Back (E)
0" (0 cm)
0" (0 cm)
Bottom (F)
Bottom (F)
0" (0 cm)
12" (32 cm)
Combustion Air/Vent
Combustion Air/Vent
piping
piping
0" (0 cm)
6" (16 cm)
Hot Water Piping
Hot Water Piping
See local code
6" (16 cm)
(1)
Required distances measured from boiler jacket.
(2)
Service, proper operation clearance recommendation.
A
E
E
D
A
C
B
A
F L O O R
F L O O R
A
D
F
F
F
F
4.1 Boiler Location Considerations
• Ambient room temperature always above 32°F (0°C) to
prevent freezing of liquid condensate.
• Approved for installation in closets.
• Protect gas ignition system components from water
(dripping, spraying, rain, etc.) during operation and
service (circulator replacement, condensate trap, control
replacement, etc.).
• Wall mount only.
• Access to outdoors to meet minimum and maximum
pipe lengths for combustion air and vent piping. See
section 6.
• Disposal of condensate. See section 6.
• Drainage of water (or water - antifreeze solution) during
boiler service or from safety relief valve discharge. See
section 5.
• Access to system water piping, gas supply, and electrical
service. See sections 5, 7 and 8.
• Clearances to combustible materials and service
clearances. See Table 2 and
fi
gure 4-1.
• Multiple Boilers can be wall mounted, placed side by
side,
or
back to back.
4 - LOCATING BOILER
Summary of Contents for DKVLT-050
Page 47: ...47 13 TROUBLE SHOOTING ...
Page 51: ...51 13 TROUBLE SHOOTING ...
Page 53: ...53 13 TROUBLE SHOOTING ...
Page 62: ...62 Supply Water Temperature Sensor Resistance Chart 13 TROUBLE SHOOTING ...
Page 64: ...64 14 WIRING DIAGRAM 14 1 Connection Diagram 050 075 100 150 200 MBH ...
Page 83: ...83 NOTES ...
Page 84: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...