Installing the transmitter
6
Installing the transmitter
Preparing for installation
The performance and effectiveness of the entire system depends essentially on the
position chosen for installing the transmitter.
The following should be noted during installation:
— Local requirements and regulations governing the installation of gas measuring
systems.
— Relevant regulations concerning the connection and routing of electric power
supply and signal lines.
— The full scope of environmental factors to which the transmitter may be exposed
(ambient conditions: see Technical data, page 19).
— Physical properties of the gas to be measured:
For gases with a density lower than that of air, the transmitter must be lo-
cated above any possible leak or at the highest point at which large concen-
trations of gas may occur.
For gases and vapours with a density greater than that of air, the transmitter
must be located below a possible leak or at the lowest point at which such
gases and vapours may occur.
— The specific uses (e.g. possible leaks, ventilation conditions, etc.).
— Accessibility for the necessary maintenance work (see Installation instructions
for the Polytron docking station).
— All other factors and conditions which could have a negative effect on the instal-
lation and operation of the system (such as vibrations or varying temperatures).
— We recommend installing a reflective shield if the unit is exposed to strong sun-
light.
— The transmitter must be installed vertically (sensor facing downwards).
— The transmitter has been tested with regard to its weather-resistance and may
be installed out of doors. Use of a splash guard is recommended to protect the
sensor from splashing water, dust and wind.
The Dräger Polytron 3000 transmitter consists of two main components:
— Dräger docking station
This can be pre-installed anywhere and contains the electrical installation com-
ponents.
— The measuring unit Dräger Polytron 3000
contains the electronics of the transmitter.
If the measuring unit is not fitted immediately after installing the docking station, the
latter should be covered with the raincover provided (dust and water protection) to
protect against dust and splashing water.
NOTE
In explosion-hazard areas:
Observe the national regulations concerning electrical equipment in
explosion-hazard areas.
Summary of Contents for Polytron 3000
Page 25: ...25 ATEX approval ATEX approval ...
Page 26: ...ATEX approval 26 ...
Page 27: ...27 ATEX approval ...
Page 28: ...ATEX approval 28 ...
Page 29: ...29 ATEX approval ...
Page 30: ...ATEX approval 30 ...
Page 31: ...31 ATEX approval ...
Page 32: ...ATEX approval 32 ...
Page 33: ...33 ATEX approval ...
Page 34: ...ATEX approval 34 ...
Page 35: ...35 ATEX approval ...
Page 36: ...ATEX approval 36 ...
Page 37: ...37 ATEX approval ...
Page 38: ...ATEX approval 38 ...
Page 39: ...39 ATEX approval ...
Page 40: ...ATEX approval 40 ...
Page 41: ...41 ATEX approval ...
Page 42: ...ATEX approval 42 ...
Page 43: ...43 ATEX approval ...
Page 44: ...ATEX approval 44 ...
Page 45: ...45 ATEX approval ...
Page 46: ...ATEX approval 46 ...
Page 47: ...47 IECEx approval IECEx approval ...
Page 48: ...IECEx approval 48 ...
Page 49: ...49 IECEx approval ...
Page 50: ...IECEx approval 50 ...
Page 51: ...51 UL approval UL approval ...
Page 52: ...UL approval 52 ...
Page 62: ...Declaration of Conformity 62 Declaration of Conformity ...
Page 63: ...63 Declaration of Conformity ...
Page 64: ...64 ...
Page 65: ...65 Drilling templates Dräger docking station 66 4 mm 02723758_1 eps ...
Page 66: ......
Page 67: ......