Start-up
12
Start-up
Switch on power supply.
The transmitter begins its warm-up routine.This is indicated by a flashing dis-
play. The warm-up phase takes between 5 minutes and 12 hours, depending
on the sensor installed. Note the information in the sensor data sheet. The
warm-up phase may take longer in extremely high or low temperatures. It is
completed when the display stops flashing.
When the sensor has warmed up:
— Transmitters set for specific calibration with calibration gas
Calibrate sensor, page 14.
— Transmitters set for use of the manufacturer's calibration setting for the sensor
Transmitter is ready for use.
Check signal transmission to the central unit and alarm output.
Analogue signal
— A current between 4 and 20 mA flows through the transmitter during normal ope-
ration. This current is proportional to the gas concentration.
— Polytron 3000 uses various current values to indicate the operating status of the
transmitter:
Display (optional)
Current
Meaning
4 mA
Zero point
20 mA
Full-scale value
<3.2 mA
Transmitter fault
3.8 mA ... 4 mA
Sensor drift below zero point
20 mA ... 20.5 mA
Full-scale value exceeded
3.4 mA ±0.2 mA
constant
Maintenance signal
— In measuring mode, the display shows the actual gas concentration, e.g.:
— The following symbols may be displayed during measurement:
— If a fault has been detected:
— If the measuring range has been exceeded:
— If the zero point is too low (sensor drift below the zero point):
00923758_1.eps
01023758_1.eps
01123758_1.eps
01223758_1.eps
Summary of Contents for Polytron 3000
Page 25: ...25 ATEX approval ATEX approval ...
Page 26: ...ATEX approval 26 ...
Page 27: ...27 ATEX approval ...
Page 28: ...ATEX approval 28 ...
Page 29: ...29 ATEX approval ...
Page 30: ...ATEX approval 30 ...
Page 31: ...31 ATEX approval ...
Page 32: ...ATEX approval 32 ...
Page 33: ...33 ATEX approval ...
Page 34: ...ATEX approval 34 ...
Page 35: ...35 ATEX approval ...
Page 36: ...ATEX approval 36 ...
Page 37: ...37 ATEX approval ...
Page 38: ...ATEX approval 38 ...
Page 39: ...39 ATEX approval ...
Page 40: ...ATEX approval 40 ...
Page 41: ...41 ATEX approval ...
Page 42: ...ATEX approval 42 ...
Page 43: ...43 ATEX approval ...
Page 44: ...ATEX approval 44 ...
Page 45: ...45 ATEX approval ...
Page 46: ...ATEX approval 46 ...
Page 47: ...47 IECEx approval IECEx approval ...
Page 48: ...IECEx approval 48 ...
Page 49: ...49 IECEx approval ...
Page 50: ...IECEx approval 50 ...
Page 51: ...51 UL approval UL approval ...
Page 52: ...UL approval 52 ...
Page 62: ...Declaration of Conformity 62 Declaration of Conformity ...
Page 63: ...63 Declaration of Conformity ...
Page 64: ...64 ...
Page 65: ...65 Drilling templates Dräger docking station 66 4 mm 02723758_1 eps ...
Page 66: ......
Page 67: ......