
The dialogue continues on the ventilator:
1
Test block No. 3 and display:
Fresh gas occl?
3
Close all three delivery valves!
Confirm:
2
Press rotary control on ventilator!
1
Display:
APL = 30 mbar?
4
Set pressure limiting valve to »MAN« and 30 mbar!
Confirm:
2
Press rotary control on ventilator!
1
Display:
Y-piece open?
5
Remove Y-piece from cone or exercise thorax!
Confirm:
2
Press rotary control on ventilator!
1
Display:
Self-test
1
Display:
Ypiece occluded?
5
Plug Y-piece onto cone!
(The sampling line is connected to the Y-piece and
the water trap.)
Confirm:
2
Press rotary control on ventilator!
1
Display with test block No. 4:
Self-test
The test then continues automatically, block by block:
●
wait – approx. 1 minute!
1
Display:
Leaktest IPPV
32
Preparing for use
Checking readiness for operation with checklist
Ventilator start-up test
1
1
2
GAS
4
5
3
05728970
01437224
05928970