Page 139 of 145
7) Include site drawing with layout and approximate distances (use space provided below):
This checklist is for annual verification of the OPW Fuel Management Systems’ SiteSentinel® iSite™ Tank Gauge System and must be performed by
an OPW Fuel Ma
nagement Systems’ Authorized Service Contractor.
The compilation of this checklist and any subsequent work or parts required to address any non-conformity is the sole responsibility of the equipment
owner.
As an OPW Fuel Management Systems’ Authorized Service Contractor I certify the above information and data is correct.
Technician's Name (Print):
Signature:
Company Name:
Date:
/
/
OPW-FMS Certification #:
_ Exp. Date:
/
/
Summary of Contents for OPW SiteSentinel iSite
Page 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Page 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Page 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Page 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Page 33: ...Page 33 of 145 www opwglobal com ...
Page 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Page 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Page 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Page 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Page 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Page 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Page 143: ...Page 143 of 145 www opwglobal com ...