Page 107 of 145
Appendix F- Icon Glossary (cont.)
Sensor Alarms in the Alarm Calendar
Description
Normal
Alarm
Acknowledged
Alarm Ended But
Not Acknowledged
Alarm Condition
Ended
Unavailable
Part numbers and description that
would be associated to the conditions.
Icon only seen during
auto-detection
process to show
sensor type.
Icon outlined with a
dotted red line and
red triangle. Occurs
when an alarm
condition is seen.
Icon outlined in blue
with red triangle.
Occurs when user
clicks on alarm in
alarm screen.
Icon outlined in blue
and triangle is blue.
Occurs when alarm
has ended but has
not been
acknowledged.
Icon completely gray.
Occurs after alarm
has been
acknowledged and
the alarm event has
ended.
Displayed when the
item is currently
unavailable. Icon is
completely grayed.
Low-Level Alarm:
Occurs when the bottom float is below
the threshold for the alarm condition.
N/A
Disconnect Alarm/Communication
Loss
:
Occurs when the sensor has been
disconnected from the barrier or the
sensor fails.
N/A
Dual Float Brine Sensor: 30-0232-D-20B
High-Level Alarm:
Occurs when the upper and lower floats
are above the threshold for the alarm
condition.
N/A
Low-Level Alarm:
Occurs when the bottom float is below
the threshold for the alarm condition.
N/A
Disconnect Alarm/Communication
Loss
:
Occurs when the sensor has been
disconnected from the barrier or the
sensor fails.
N/A
NOTE:
When sensors are added manually to the system when using non-smart sensors or adding sensors to a VSmart Module, the icons will have a little man in the
upper-left-hand corner of the icons, as shown to the right.
Summary of Contents for OPW SiteSentinel iSite
Page 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Page 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Page 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Page 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Page 33: ...Page 33 of 145 www opwglobal com ...
Page 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Page 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Page 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Page 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Page 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Page 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Page 143: ...Page 143 of 145 www opwglobal com ...