Page 39 of 145
4.5.6 Finishing the Flex Probe Installation
25. Connect the probe wiring bushing ½-inch NPT to the
junction box using a short length [18 inches (45.7 cm) max]
of flex conduit.
26. Connect the probe to the cable in the junction box and
console as below.
27. Verify that the probe is operating correctly at the console.
28. Waterproof the probe connections at the junction box with
the epoxy seal-pack and close the junction box.
Figure 4-7 Finishing the Flex Probe Installation
Figure 4-8 Flex Probe Component Diagram
Summary of Contents for OPW SiteSentinel iSite
Page 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Page 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Page 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Page 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Page 33: ...Page 33 of 145 www opwglobal com ...
Page 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Page 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Page 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Page 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Page 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Page 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Page 143: ...Page 143 of 145 www opwglobal com ...