12 Installation with Existing OPW/EECO
Equipment
12.1 Model 924A Probes
CANNOT BE MULTI-DROPPED ON VSmart.
The Model 924A Probe (Figure 12-1) utilizes magnetostrictive
technology to derive accurate product and water levels. It is primarily
used in underground storage tanks for inventory and leak detection.
Two floats can be fitted to the probe shaft; the product float sits on top
of the product and the water float (optional) sinks through the product
and sits on top of the water at the bottom of the tank.
924A Probe Specifications
Operating Temperature:
-40°F to 158°F (-40°C to +70°C)
Head Dimensions:
≈ 2.2” (5.6 cm) x 7.5” (19.1 cm)
Required Cable:
6’ (1.8 m), gas/oil-resistant cable
Sensor Power Supply:
Must be by provided by OPW's IS barrier
Certifications:
Division I Group D Group IIA
Linearity:
+/-
0.040” (1.01 mm) over entire length
Hysteresis:
+/-
0.004” (0.1 mm)
Temperature Resolution:
+/- 0.1°C, +/- 1°C
VSmart I.S. Barrier:
12V; P/N: 4344
Installation:
Requires one (1) I.S. Barrier position per
probe
Five temperature sensors reside in the probe shaft for measuring
product temperature at different levels in the tank. They are located at
positions of approximately 20%, 40%, 60% and 80% of the tank’s
volume. The sensors feed the data of the temperature of the fuel to
the console. The console software is then able to make the
calculations to produce a net corrected product volume.
Figure 12-1 Model
924A Probe
Summary of Contents for OPW SiteSentinel iSite
Page 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Page 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Page 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Page 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Page 33: ...Page 33 of 145 www opwglobal com ...
Page 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Page 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Page 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Page 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Page 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Page 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Page 143: ...Page 143 of 145 www opwglobal com ...