3.3
Storage
Requirements for the warehouse:
Do not store outdoors.
Store in a dry and dust-free place.
Do not expose to aggressive media.
Protect from solar radiation.
Avoid mechanical vibrations.
Temperature: 10 °C to 40 °C
Relative humidity: 35 % to 90%
4
Assembly
4.1
Requirements for the
Installation point.
It must be possible to disconnect the
compressed air supply and material feed
to the spray gun and secure it against
reconnection.
Lines, seals and screw connections must
be designed to conform to the spray gun
requirements
A fastening device capable of securing
the spray gun is required.
The control air supply must be adjustable.
4.2
Assembly
Protective equipment:
Protective workwear
Protective gloves
Observe the following at assembly:
Diameter of the fastening bore: 6.4 mm
Nominal diameters:
Control air and atomizer air:
Ø
6 mm
push-in connector (M5 thread)
Material connection:
Ø
6 mm push-in
connector (G1/8” thread)
1.
WARNING!
Sources of ignition may cause explo-
sions!
Ensure a non-explosive atmosphere.
Fig. 2: Assembly
2. Slide the atomizer with the fastening bore
(1) onto the fastening device and secure
it.
Alignment is not important.
Assembly
11/2016
EcoGun AS AUTO Mini RS - MSG00007EN
7/28