![DORCHESTER DR-FC 120 Installation, Comissioning And Maintenance Instructions Download Page 95](http://html1.mh-extra.com/html/dorchester/dr-fc-120/dr-fc-120_installation-comissioning-and-maintenance-instructions_2521679095.webp)
Instruction manual DR-FC
93
is
TERMINAL BLOCK CONNECTIONS:
Earth
N
Neutral
L
Live input of controller
L
1
Live input of isolating transformer (primary side)
L
2
Live output of isolating transformer (secondary side)
L
3
Live input of program-controlled pump
COMPONENTS:
A
Controller
B
flame probe
C
hot surface igniter
D
Gas control valve
E
Burner earth connection
F
Extra ON mode switch
G
Program-controlled pump
H
Extra error signal connection
J
Isolating transformer
K
Double-pole isolator
L
Controller 0/I switch
M
Display
N
Fan
O
Temperature sensor (T
2
- bottom of tank)
P
Dummy
Q
Temperature sensor (T
1
- top of tank)
R
Selection resistor
S
Pressure switch
T
Power anodes
U
Power anode signal
V
Potentiostat
CONTROLLER CONNECTIONS:
J2
Power connection for controller
J19
Extra error signal connection
J20
Gas inlet connection
J21
Program-controlled pump connection
J40
Fan connection
J36
Controller display connection
JP2
Flame probe and hot surface igniter connection
JP3
Temperature sensor T
2
connection
JP4
Dummy connection
JP5
Temperature sensor T
1
connection
JP6
Selection resistor and pressure switch connection
JP8
Extra ON mode switch connection
F1
Fuse
(T 3.15 A - 250 V)
F3
Fuse
(T 3.15 A - 250 V)
Summary of Contents for DR-FC 120
Page 2: ......
Page 4: ......
Page 6: ...4 Instruction manual DR FC gis...
Page 10: ...Table of contents 8 Instruction manual DR FC...
Page 58: ...Shutting down 56 Instruction manual DR FC 10 gis...
Page 70: ...Service program 68 Instruction manual DR FC 12 is...
Page 84: ...Service interval 82 Instruction manual DR FC 14 is...
Page 90: ...Warranty 88 Instruction manual DR FC 16 s...
Page 93: ...Instruction manual DR FC 91 is...
Page 96: ...Appendices 94 Instruction manual DR FC 17 is...
Page 98: ...Instruction manual DR FC 96...