![DORCHESTER DR-FC 120 Installation, Comissioning And Maintenance Instructions Download Page 41](http://html1.mh-extra.com/html/dorchester/dr-fc-120/dr-fc-120_installation-comissioning-and-maintenance-instructions_2521679041.webp)
Instruction manual DR-FC
39
is
Note
Turning to the left (anticlockwise) means less gas (lower CO
2
level) and
turning to the right (clockwise) means more gas (higher CO
2
level).
24. Remove the CO
2
measurement probe from the test point of the flue gas
outlet pipe.
25. Put the cap back on the flue gas outlet test point.
26. Shut off the gas supply.
27. Replace the covers.
3.11.3
Switching pressure measurement
To measure the switching pressure, proceed as follows:
1. Isolate
(10.3 "Isolating the water heater from the mains")
the water heater
from the power supply.
2. Carefully remove the covers from the water heater.
3. The electrical section is now visible.
4. Remove the black caps from the pressure switch test point
5. Connect the + of the pressure gauge to the H of the pressure switch test
point.
6. Connect the - of the pressure gauge to the L of the pressure switch test point
7. Zero the pressure gauge.
8. Start
(9 "Starting the water heater")
the water heater.
9. The water heater will now run through the operating cycle
(2.3 "Water heater
operating cycle")
.
Legend
1.
test point
2.
adjusting screw
IMD-0763 R0
1
2
Summary of Contents for DR-FC 120
Page 2: ......
Page 4: ......
Page 6: ...4 Instruction manual DR FC gis...
Page 10: ...Table of contents 8 Instruction manual DR FC...
Page 58: ...Shutting down 56 Instruction manual DR FC 10 gis...
Page 70: ...Service program 68 Instruction manual DR FC 12 is...
Page 84: ...Service interval 82 Instruction manual DR FC 14 is...
Page 90: ...Warranty 88 Instruction manual DR FC 16 s...
Page 93: ...Instruction manual DR FC 91 is...
Page 96: ...Appendices 94 Instruction manual DR FC 17 is...
Page 98: ...Instruction manual DR FC 96...