Electrical System
Page 67
SP000935
Operation
1.
Digging Mode
This mode is used for general digging work, loading work
and ground leveling work requiring quick stops. The current
to the solenoid valve for swing priority is shut off.
2.
Trenching Mode
This mode is used for heavy duty ditch digging work or for
loading work requiring big swing angles. The voltage is
assigned to the swing priority control valve activating the
swing control valve restricting the flow of oil to the boom
and the arm.
ARO0270L
Figure 57
Summary of Contents for DX225LC
Page 1: ......
Page 3: ...Electrical System SP000935 Page 2 MEMO ...
Page 7: ...Electrical System SP000935 Page 6 MEMO ...
Page 9: ...Electrical System SP000935 Page 8 ...
Page 56: ...Electrical System Page 55 SP000935 ...
Page 64: ...Electrical System Page 63 SP000935 ...
Page 82: ...Electrical System Page 81 SP000935 ...
Page 129: ...SP000936 Electrical Schematic DX180LC DX225LC DX225NLC DX255LC MEMO ...
Page 131: ...SP000936 Electrical Schematic DX180LC DX225LC DX225NLC DX255LC MEMO ...
Page 133: ...SP000936 Electrical Schematic DX180LC DX225LC DX225NLC DX255LC Page 6 ...