
Electrical System
Page 79
SP000935
The Power Boost function is used to temporarily increase the
main relief pressure to enhance excavation ability. When the
breaker/boost/shear selector switch is set to "BOOST" and the
power boost button on the center of the right-hand work lever
(joystick) is pressed during work, the e-EPOS controller will
activate the power boost solenoid valve and increase the relief
valve pressure from 330 - 350 kg•cm
2
(4,700 - 5,000 psi). The
excavation ability is increased by approximately 6%.
When the power boost function is in activated, a power boost
symbol appears on the information display department of
instrument panel.
NOTE:
Do not use this switch for more than 10 seconds.
Summary of Contents for DX225LC
Page 1: ......
Page 3: ...Electrical System SP000935 Page 2 MEMO ...
Page 7: ...Electrical System SP000935 Page 6 MEMO ...
Page 9: ...Electrical System SP000935 Page 8 ...
Page 56: ...Electrical System Page 55 SP000935 ...
Page 64: ...Electrical System Page 63 SP000935 ...
Page 82: ...Electrical System Page 81 SP000935 ...
Page 129: ...SP000936 Electrical Schematic DX180LC DX225LC DX225NLC DX255LC MEMO ...
Page 131: ...SP000936 Electrical Schematic DX180LC DX225LC DX225NLC DX255LC MEMO ...
Page 133: ...SP000936 Electrical Schematic DX180LC DX225LC DX225NLC DX255LC Page 6 ...