13.Navigate to tab index C page 2 by pressing the down arrow at
the far right of the process config screen.
14.Touch the “Final Dwell Time (sec)” to access the keyboard. Enter
a time value in seconds defining the final amount of time the
fixture will rest when all the repeated move steps are complete.
This is the final amount of time the object is being polished
before being completely polished.
15.Touch the “Production Film Gap” to access the keyboard. Enter a
distance value in microns defining the distance the fixture will
move up after the process step is complete. If additional
polishing steps are needed after this step the film gap should be
a minimum of 50 microns above the polishing film so when the
arm is raised up for polishing film change and then re-lowered
the object will not strike the polishing media.
16.Touch the “Load Fibers”checkbox to enable/disable the load fibers
functionality of the machine. This function is used to move the
polishing fixture down towards the polishing film so it can be
used as a protrusion setting apparatus.
17.Touch the “Load Position (um)” to access the load position setup
screen. This screen allows the user to move/jog the fixture
position to the ideal position desired for loading bare fibers
during the step. Once the position is set and the user exits the
screen a positional value in microns will be stored.
56