CT100G Series Inverter
CHAPTER 2 INSTALLATION AND WIRING
- 14 -
and braking
resistor
during braking.
Output reactor
Reduce the protection of the inverter due to leakage current;
When the cable connecting the inverter and the motor is more
than 100m, it is recommended to install the output reactor.
2.2.2 Standard configuration of peripheral components
Figure 2-1 Standard peripheral components