User information Doka forming wagon T
Assembly instructions
The assembly workflow outlined here is for the
standard set-up. In practice, attention must also be
paid to the relevant assembly plan or shop draw-
ing!
Tools needed:
●
Reversible ratchet 1/2"
●
Extension piece 11cm
●
Box nut 24
●
Fork spanner 22/24
●
Fork spanner 13/17
Position the Bogie for Forming
wagon TS
➤
Lay the rails (A) .
➤
Attach four-part lifting tackle to Bogie for Form-
ing wagon TS (B) .
Spreading angle of lifting tackle: max. 60°.
Close-ups of crane hoisting points
➤
Lower the "Bogie for Forming wagon TS" onto
the rails.
a ... Centre-to-centre spacing of rails = 197.5 cm
x ... Distance from edge of bridge superstructure, as per shop
drawing
Rear crane-hoisting point
Front crane-hoisting point, and
parking wedge to immobilise
the bogie
Warning about accidental movement of
bogie!
➤
Fit parking wedges (C) to the "Bogie for
Forming wagon TS" to immobilise it in
both directions during all stages of the
erection operation
9730-203-01
B
9730-204-01
B
9730-204-01
C
B
9730-202-01
a
x
A