![DMP Electronics CellCom LTE Series Programming And Installation Manual Download Page 17](http://html1.mh-extra.com/html/dmp-electronics/cellcom-lte-series/cellcom-lte-series_programming-and-installation-manual_2513811017.webp)
CellCom‑LTE Programming and Installation Guide
Digital
Monitoring
Products
13
Honeywell Vista 20 Panel Wiring
1. Connect the communicator’s
Z1
(zone 1) terminal to output
17
on the control panel.
2. Connect the communicator’s
O1
(output 1) terminal to the control panel’s keyswitch or arming zone.
3. Connect the
T
(tip) terminal on the communicator to terminal
23
on the control panel.
4. Connect the
R
(ring) terminal on the communicator to terminal
24
on the control panel.
5. Power the communicator by connecting its terminal
+12V
to terminal
5
on the control panel.
6. Connect the communicator’s
GND
(ground) terminal to terminal
4
on the control panel.
PROG
B
R
RESET
LOAD
+DC- Z1 Z2 Z3 G
T R
+Z4- O1 O2
CellCom-LTE-V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Honeywell Vista 20 Series
OUTPUT 17
Connect to any
keyswitch or arming
zone.
Figure 12: Vista 20 Series Control Panel to CellCom
Summary of Contents for CellCom LTE Series
Page 4: ......