![Ditch Witch JT1220 Mach 1 Operator'S Manual Download Page 95](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007095.webp)
Conduct a Bore - 94
JT1220 Mach 1 Operator’s Manual
Assemble Drill String
CMW
Connect Drill Pipe
1.
Start drilling unit engine.
2.
Align transition sub (3) in front wrench.
3.
Clamp tool in front wrench. See “Clamp Pipe” on page 92.
4.
Load pipe (4).
•
Make sure pipe box is positioned correctly.
•
Close grippers.
•
Lubricate upper pipe threads.
•
Move pipe to spindle. Verify that lower threads were lubricated as pipe moved to spindle.
•
Raise pipe in box.
5.
Connect pipe.
•
Move carriage forward until saver sub nears male pipe thread.
•
Slowly rotate spindle clockwise. Carriage will move forward as threads screw together.
•
Slowly move carriage forward until pipe end touches end of transition sub.
•
To screw pipes together and fully torque joint, slowly rotate drill pipe until spindle stops turning.
•
Open wrench.
•
Open grippers.
•
Retract shuttles fully.
•
Lower pipe lifters.
6.
Close guides.
Summary of Contents for JT1220 Mach 1
Page 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Page 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Page 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...