Prepare - 72
JT1220 Mach 1 Operator’s Manual
Check Supplies and Prepare Equipment
CMW
Check Supplies and Prepare Equipment
Check Supplies
•
receiver/transmitter or tracker with spare batteries
•
beacons with new and spare batteries
•
two-way radios with new and spare batteries
•
quick wrench (see page 129)
•
transition sub
•
anchoring equipment and accessories
•
bits, screens, nozzles (see page 124)
•
adapters, pipe, beacon housings
•
marking flags or paint
•
water and additional hoses
•
fuel
•
drilling fluid additives (see page 116)
•
spare fuses
•
keys
•
backreamers, swivels, pulling devices (see page 124)
•
wash down hose and spray gun
•
duct tape
•
spray lubricant
•
tool joint compound (see page 157)
•
electrically insulating boots and gloves
•
personal protective equipment, such as hard hat and safety glasses
•
notepad and pencil
Summary of Contents for JT1220 Mach 1
Page 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Page 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Page 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...