Conduct a Bore - 90
JT1220 Mach 1 Operator’s Manual
Start System
CMW
Start System
1.
Start drilling unit and remote fluid unit. Allow both engines to warm up.
2.
Enable tracker control mode if desired. See “Tracker Control” on page 121.
3.
Press top of drilling unit throttle switch until engine is at full throttle. If you do not want to use
autothrottle mode, return switch to center position.
4.
Press and hold quick fill fluid pump switch until pipe fills and fluid pressure begins to rise.
Prime Drilling Fluid Pump
Prime drilling fluid pump each time tank is changed. To prime the pump:
1.
Fill drilling fluid hose and connect hose to unit.
2.
Operate mixing/transfer pump at full speed for 1 - 3 minutes to discharge air from system.
3.
Return mixing/transfer pump to normal operating speed and continue the bore.
4.
If drilling fluid pressure surges are observed, repeat step 2.
IMPORTANT: Ensure that mixture of drilling fluid matches drilling conditions.
Incorrect procedures could result in death, injury, or property damage.
Learn to use equipment correctly.
NOTICE: Failure to prime the drilling fluid pump will cause flow fluctuations, which will
make it difficult to control the washwand.
Pressurized fluid or air could pierce skin and cause injury
or death. Stay away.
Summary of Contents for JT1220 Mach 1
Page 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Page 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Page 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...