JT1220 Mach 1 Operator’s Manual
Prepare - 71
Prepare Jobsite
CMW
Prepare Jobsite
Mark Bore Path
Mark your planned bore path and all located utility lines with flags or paint.
Prepare Entry Point
For bore to be successful, first pipe must be straight as
it enters the ground.
To help ensure that the first pipe does not bend, dig a
small starting hole so that the first pipe is drilled into a
vertical surface.
To prevent bending or straining pipe, position drilling
unit for straight entry.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
NOTICE:
•
If jobsite classification is in question or if the possibility of unmarked electric utilities exists, classify
jobsite as electric.
•
Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
•
All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
Summary of Contents for JT1220 Mach 1
Page 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Page 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Page 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...