![Ditch Witch JT1220 Mach 1 Operator'S Manual Download Page 105](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007105.webp)
Conduct a Bore - 104
JT1220 Mach 1 Operator’s Manual
Remove Pipe
CMW
8.
Break rear joint.
•
Engage rear wrench.
•
Slowly rotate spindle counterclockwise until joint is loosened. Do not fully unscrew joint.
•
Disengage rear wrench.
•
Move carriage back until front end of pipe is positioned inside front end of pipe box.
•
Rotate spindle counterclockwise until saver sub is unscrewed from pipe.
•
Stop rotation and move carriage to back of frame.
9.
Ensure pipe box is positioned correctly.
10. Load pipe into pipe box.
11. Attach saver sub to next pipe.
•
Move carriage forward until saver sub touches pipe.
•
Rotate spindle to screw onto pipe. Slowly tighten joint to full machine torque.
12. Disengage front wrench to release pipe.
Manual Pipeloader Controls
Automated Pipeloader Control
•
Move shuttle under pipe box.
•
Release grippers and raise lift arms to
place pipe in box.
•
Lube front threads.
•
Press resume. Green control cycle light
will come on.
•
Shuttles will retract, front threads will be
lubed, grippers will release pipe, pipe
lifters will raise until pipe is off shuttles,
and then green control cycle light will
flash.
Summary of Contents for JT1220 Mach 1
Page 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Page 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Page 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...