Operation Overview - 56
JT1220 Mach 1 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 61.
2.
Inspect jobsite. See page 62.
3.
Classify jobsite. See page 64.
4.
Plan bore path. See page 66.
5.
Check supplies and prepare equipment. See page 72.
6.
Load equipment. See page 81.
Setting Up at Jobsite
1.
Prepare jobsite. See page 71.
2.
Unload drilling unit from trailer. See page 84.
3.
Assemble drill string. See page 93.
4.
Position drilling unit and frame. See page 89.
5.
Assemble strike system. See page 110.
6.
Anchor drilling unit. See page 109.
7.
Connect fluid system. See page 89.
8.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
Summary of Contents for JT1220 Mach 1
Page 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Page 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Page 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...