![Ditch Witch JT1220 Mach 1 Operator'S Manual Download Page 133](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007133.webp)
Systems and Equipment - 132
JT1220 Mach 1 Operator’s Manual
Drill Pipe
CMW
Use Caps and Plugs
Before transporting in dusty conditions or prolonged
storage, install caps and plugs to male and female
ends of pipe and to saver sub.
Replace Worn Saver Sub
Because each pipe comes in contact with the saver sub, check saver sub regularly for wear. Replace it
when it is worn, or it will damage your drill pipe. See page 184 for replacement procedure.
Precondition a new saver sub the same way you do new pipe. See “Precondition New Pipe” on page 131.
Rotate Pipe Order
Because the lead drill pipe is in the ground longer, it is subjected to higher shock loads and experiences
more wear. To help spread this wear evenly over all pipe, move the lead pipe from the previous job out of
the first position. See “Rotate Drill Pipe Order” on page 136.
Summary of Contents for JT1220 Mach 1
Page 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Page 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Page 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...