B-48
Air purge procedures (Continued)
Step No.
Procedure
4
Press
.
・
The following screen appears.
5
Press
.
・
The water flow/air blow system of the chuck table turns ON.
6
Keep the water flow/air blow system turned ON for 2 to 3 minutes to expel air from the
vacuum pump and water hoses.
7
Press
.
・
The water flow/air blow system of the chuck table turns OFF.
Continued in the next section.
Summary of Contents for DAG810
Page 85: ......