B-58
2-4-2. Installation of Z-axis Retainer Jig
Equipment you must have ready
Allen wrench (5 mm)
Procedures to install the Z-axis retainer jig
Step No.
Procedure
(Continued from the previous section)
1
Open the grinding section side cover (L).
Z-axis grinding section side cover (L)
2
Install the Z-axis retainer jig (red) with the 4 hexagon socket-head screws (M6).
Z-axis retainer jig
Continued in the next section.
Summary of Contents for DAG810
Page 85: ......