Contents-1
CONTENTS
READ CAREFULLY BEFORE USING THIS MANUAL
INTRODUCTION ..............................................Introduction-1
CONTENTS.......................................................... Contents-1
A. SPECIFICATIONS AND ENVIRONMENTAL
REQUIREMENTS OF THE MACHINE.........................A-1
1. Machine Specifications ................................................................................................ A-2
2. Dimensions and Mass of Machine on Delivery ............................................................ A-4
3. Environmental Conditions ............................................................................................ A-5
3-1. Installation Space .......................................................................................................................... A-6
3-2. Environmental Conditions for Installation...................................................................................... A-8
3-3. Environmental Conditions for Storage and Transportation ......................................................... A-10
4. Piping and Wiring Diagram ........................................................................................ A-11
4-1. Rear Panel Connection Ports...................................................................................................... A-12
4-2. Piping and Wiring Diagram ......................................................................................................... A-14
B. INSTALLATION AND RELOCATION OF MACHINE ....B-1
1. Machine Installation ..................................................................................................... B-2
1-1. Hoisting and Lowering the Machine .............................................................................................. B-4
1-2. Transferring the Machine .............................................................................................................. B-9
1-3. Leveling the Machine .................................................................................................................. B-12
1-4. Installation of Machine Anchors [Optional Accessory] ................................................................ B-14
1-5. Piping Connection ....................................................................................................................... B-15
1-5-1. Drain and Exhaust Duct Piping Connection ..................................................................... B-19
1-5-2. Utility Piping Connection .................................................................................................. B-21
1-6. Power Cable Connection ............................................................................................................ B-23
1-6-1. Power Cable Installation to Machine Main Body.............................................................. B-25
1-6-2. Connection of Power Cable of Vacuum Unit [Optional Accessory] .................................. B-29
1-6-3. Connection of Power Cable of Booster Pump Unit [Optional Accessory] ........................ B-30
1-6-4. Connection of Power Cable of Duct Unit [Optional Accessory] ....................................... B-31
1-6-5. Connection of Power Cable of Coolant Unit [Optional Accessory] .................................. B-32
1-6-6. Connection of Signal Cables of Water Temperature Control Unit (DTU152) ................... B-33
Summary of Contents for DAG810
Page 85: ......