19
The initial inspection and test loading of the Dino aerial work platforms is performed by the
manufacturer. A protocol, drawn up during the inspection, will accompany the lift.
The protocols of the start-up and periodic inspections must be kept with the lift or its
immediate proximity for at least five years.
E. ELECTRIC APPLIANCES
G. SAFETY DEVICE
1. Electric appliances
1. Safety limit switch
2. Sound signal
F. CONTROL DEVICES
1. Protections
H. LOADING TEST
2. Symbols / directions
1.Dynamic = 237 kg
3. Placings
2. Static = 323 kg
4. Emergency stop
3. Work movements
FAILINGS AND NOTES
Failings have been repaired.
Date:
Signature:
Dinolift Oy
Raikkolantie 145
FIN-32210 LOIMAA, FINLAND
Tel. +358 - 20 - 1772 400, Fax +358 - 2 - 7627 160, e-mail: [email protected]
Summary of Contents for DINO XT II 160
Page 2: ......
Page 6: ...6 Ekspluat cijas instrukcijas DINO 160XT II 180XT II 210XT II BLANK...
Page 11: ...11 2 1 2 180 XTB II...
Page 12: ...12 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 3 210 XTB II...
Page 29: ...29 BLANK...
Page 37: ...37 NOTES...
Page 58: ...58 Operating instructions DINO 160XTB II 180XTB II 210XTB II NOTES...
Page 59: ...59 NOTES...
Page 63: ...63 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13 14...
Page 69: ...69 BLANK...
Page 70: ...70 Operating instructions DINO 130T II BLANK...
Page 72: ...72 Operating instructions DINO 130T II NOTES...
Page 73: ...73 NOTES...