OPERATOR
’S MANUAL
with Maintenance Information
Maintenance
43
Crushing hazard. Keep
hands clear of the safety arm when lowering
the platform.
7 Inspect the center chassis area and
scissor arms for burnt, chafed and pinched
cables.
8 Inspect the following areas for burnt,
chafed, corroded, pinched and loose
wires:
· Scissor arms
· ECM to platform controls
· Power to platform wiring
9 Inspect for a liberal coating of dielectric
grease in all connections between the
ECM and the platform controls.
10 Raise the platform and return the safety
arm to the stowed position.
11 Lower the platform to the stowed position
and turn the machine off.
B-3
Confirm the Proper Brake
Configuration
Dingli requires that this procedure be
performed every 250 hours or quarterly,
whichever comes
Proper brake configuration is essential to safe
operation and good machine performance.
Hydraulically-released, spring-applied
individual wheel brakes can appear to operate
normally when they are actually not fully
operational.
Check each drive hub disconnect cap to be
sure it is in the engaged position.
Disengage Position
Engage Position
Summary of Contents for JCPT1523DC
Page 3: ......
Page 5: ......
Page 17: ...OPERATOR S MANUAL with Maintenance Information Decals 12 ...
Page 18: ...OPERATOR S MANUAL with Maintenance Information Decals 13 ...