OPERATOR
’S MANUAL
with Maintenance Information
Pre-operation Inspection
21
Pre-operation Inspection
Be sure that the operator’s manual are
complete, legible and in the storage
container located in the platform.
Be sure that all decals are legible and in
place. See Decals section.
Check for hydraulic oil leaks and proper
oil level. Add oil if needed. See
Maintenance section.
Check for battery fluid leaks and proper
fluid level. Add distilled water if needed.
See Maintenance section.
Check the following components or areas for
damage, improperly installed or missing parts
and unauthorized modifications:
Electrical components, wiring and
electrical cables
Hydraulic hoses, fittings, cylinders and
manifolds
Battery pack and connections
Drive motors
Wear pads
Tires and wheels
Ground strap
Limit switches, alarms and horn
Nuts, bolts and other fasteners
Platform overload components
Platform entry gate
Beacon (if equipped)
Safety arm
Platform extension(s)
Scissor pins and retaining fasteners
Platform control joystick
Brake release components
Pothole guard
Check entire machine for:
Cracks in welds or structural
components
Dents or damage to machine
Be sure that all structural and other
critical components are present and
all associated fasteners and pins are
in place and properly tightened
Be sure side rails are installed and rail
pins and bolts are fastened.
Be sure that the chassis trays are
closed and latched and the batteries
are properly connected.
Note: If the platform must be raised to inspect
the machine, make sure the safety arm is in
place. See Operating Instructions section.
Summary of Contents for JCPT1523DC
Page 3: ......
Page 5: ......
Page 17: ...OPERATOR S MANUAL with Maintenance Information Decals 12 ...
Page 18: ...OPERATOR S MANUAL with Maintenance Information Decals 13 ...