OPERATOR
’S MANUAL
with Maintenance Information
Transport and Lifting Instructions
34
Observe and Obey:
√
Only qualified riggers should rig and lift the
machine.
√
Be sure the crane capacity, loading
surfaces and straps or lines are sufficient to
withstand the machine weight. See the
serial plate for the machine weight.
Lifting Instructions
Fully lower the platform. Be sure the extension
decks, controls and covers are secure.
Remove all loose items on the machine.
Determine the center of gravity of your
machine using the table and the picture on this
page.
Attach the rigging only to the designated lifting
points on the machine. There are two lifting
points on each end of the machine.
Adjust the rigging to prevent damage to the
machine and to keep the machine level.
Center of gravity
X Axis
Y Axis
JCPT1523DC
without outriggers
1.95 m
1.0 m
JCPT1523DC
with outriggers
2.00 m
1.0 m
JCPT1823DC
2.00 m
1.0 m
Summary of Contents for JCPT1523DC
Page 3: ......
Page 5: ......
Page 17: ...OPERATOR S MANUAL with Maintenance Information Decals 12 ...
Page 18: ...OPERATOR S MANUAL with Maintenance Information Decals 13 ...