9
5.2.7
Slide the Cartridge Bin onto the Chute/Bin Bracket of the Strong Mount with the Operating Handle pushed
fully to the back, to the priming position allowing clearance between the Handle and Bin.
5.2.8
Cycle the Operating Handle down and up slowly. Verify the Handle and Crank completely clear the bench
and that there is no contact with the Chute Bin Mount Standard bracket.
5.2.9
The Standard Operating Handle has a black ball knob. A Roller Handle PN17950 is an option.
5.2.10
Install the Primer System Operating Rod in the Operating Rod Bracket as shown below by lightly greasing
the short-bent end and then inserting it in the hole. Note—the installed height of the Operating Rod
Bracket is factory set.
5.2.11
Hold the Operating Handle halfway down. Pull the spring-loaded Primer Slide out and position the
Operating Rod so that it is aligned in the upper Small White Roller and the lower Large White Roller as
shown below. Cycle the Operating Handle down and back up. The Slide should move back and forth
smoothly.
Align
Primer
Slide
Operating
Rod in both
White
Rollers as
shown
Clearance
required
between
Handle and
Bin
Lightly grease top bent
leg of
the
Operating Rod
and install it in Operating
Rod Bracket
The location
of the
Operating
Rod Bracket is
Factory Set—
do not change
Summary of Contents for RL550C
Page 44: ...44 9 4 Powder Measure Conversion refer to the Exploded View below ...
Page 60: ...60 15 RL550C EXPLODED VIEWS AND PARTS IDENTIFIER 15 1 Complete Assembly Exploded View 1 ...
Page 61: ...61 15 2 Frame and Lower Assembly Exploded View 2 ...
Page 62: ...62 15 3 Toolhead Assembly Exploded View 3 ...
Page 63: ...63 15 4 Platform and Components Exploded View 4 ...
Page 64: ...64 15 5 Primer Feed Assembly PN 20263 no Operating Rod Exploded View 5 ...
Page 65: ...65 15 6 Powder Measure Assembly ...
Page 66: ...66 15 7 Primer Early Warning System PN20302 Rod and PEWS Kit PN14497 PEWS Alone ...
Page 75: ...75 18 RL550C TEMPLATE FOR DRILLING MOUNTING HOLES IN BENCH ...