13
5.9.2
Screw the Powder Die with the Powder Funnel into Station 2. Stop when the Die is flush with the bottom
of the Toolhead, and tighten the Lock Ring finger tight for now. The Powder Funnel should move freely up
and down in the Powder Die.
5.9.3
Slide the Powder Measure down over the Powder Die and lightly tighten the two clamp screws.
5.9.4
Install the bent end of the Powder Measure Failsafe Rod through the slot and hole in the Lock-Link
Assembly oriented as shown below.
Lock-link
Assembly
Install upper
end of the
Failsafe Rod in
the Lock Link
Assembly
Place
Powder
Measure on
Powder die
Lightly tighten
the Powder
Measure Clamp
Screws
Thread Power
Die into Station 2
and drop the
Powder Funnel in
the Powder Die
Summary of Contents for RL550C
Page 44: ...44 9 4 Powder Measure Conversion refer to the Exploded View below ...
Page 60: ...60 15 RL550C EXPLODED VIEWS AND PARTS IDENTIFIER 15 1 Complete Assembly Exploded View 1 ...
Page 61: ...61 15 2 Frame and Lower Assembly Exploded View 2 ...
Page 62: ...62 15 3 Toolhead Assembly Exploded View 3 ...
Page 63: ...63 15 4 Platform and Components Exploded View 4 ...
Page 64: ...64 15 5 Primer Feed Assembly PN 20263 no Operating Rod Exploded View 5 ...
Page 65: ...65 15 6 Powder Measure Assembly ...
Page 66: ...66 15 7 Primer Early Warning System PN20302 Rod and PEWS Kit PN14497 PEWS Alone ...
Page 75: ...75 18 RL550C TEMPLATE FOR DRILLING MOUNTING HOLES IN BENCH ...