7
5.2.3
Insert the Operating Handle through the hole in the Crank and securely fasten with the provided self-
locking 7/8” Nut while holding the Handle from moving using a 5/32” Allen wrench through the hole in
the Handle.
5.2.4
Slide the Spent Primer Cup down onto the wedge-shaped mounting tab on the right Link Arm.
.
5.2.5
Mount the included ejected Cartridge Bin Bracket to your bench if you are NOT using the Dillon Strong
Mount. Allow about 1/8” clearance between the Platform and the Ejected Cartridge Chute Bin Bracket.
Fasten the Bracket to the bench with two self-threading screws or bolts and nuts as shown below. The
Cartridge Collection Bin slides onto the bracket to catch completed cartridges.
Insert Handle in
hole in Crank and
thread Locknut on
the Handle
Tighten 7/8” nut with
a wrench while
holding the Handle
from rotating with a
5/32” Allen wrench
Mounting tab on
Link Arm
Included Standard Ejected-
Cartridge/Chute/Bin Bracket
Summary of Contents for RL550C
Page 44: ...44 9 4 Powder Measure Conversion refer to the Exploded View below ...
Page 60: ...60 15 RL550C EXPLODED VIEWS AND PARTS IDENTIFIER 15 1 Complete Assembly Exploded View 1 ...
Page 61: ...61 15 2 Frame and Lower Assembly Exploded View 2 ...
Page 62: ...62 15 3 Toolhead Assembly Exploded View 3 ...
Page 63: ...63 15 4 Platform and Components Exploded View 4 ...
Page 64: ...64 15 5 Primer Feed Assembly PN 20263 no Operating Rod Exploded View 5 ...
Page 65: ...65 15 6 Powder Measure Assembly ...
Page 66: ...66 15 7 Primer Early Warning System PN20302 Rod and PEWS Kit PN14497 PEWS Alone ...
Page 75: ...75 18 RL550C TEMPLATE FOR DRILLING MOUNTING HOLES IN BENCH ...