8
5.2.6
The preferred operating method of the RL550C is standing up. This provides the force needed to seat
primers properly. A recommended option is to install the RL550C using the Dillon Strong Mount PN22051
below. Installation instructions are included with the Strong Mount. The Dillon Strong Mount improves
the stability of the system by distributing the loading forces over a larger area of the bench and provides
mounting locations for optional bins and trays.
.
Standard
Chute/Bin
Bracket can be
mounted as
shown
Align cut out
for Operating
Handle
clearance
when Handle
is pushed fully
back
Summary of Contents for RL550C
Page 44: ...44 9 4 Powder Measure Conversion refer to the Exploded View below ...
Page 60: ...60 15 RL550C EXPLODED VIEWS AND PARTS IDENTIFIER 15 1 Complete Assembly Exploded View 1 ...
Page 61: ...61 15 2 Frame and Lower Assembly Exploded View 2 ...
Page 62: ...62 15 3 Toolhead Assembly Exploded View 3 ...
Page 63: ...63 15 4 Platform and Components Exploded View 4 ...
Page 64: ...64 15 5 Primer Feed Assembly PN 20263 no Operating Rod Exploded View 5 ...
Page 65: ...65 15 6 Powder Measure Assembly ...
Page 66: ...66 15 7 Primer Early Warning System PN20302 Rod and PEWS Kit PN14497 PEWS Alone ...
Page 75: ...75 18 RL550C TEMPLATE FOR DRILLING MOUNTING HOLES IN BENCH ...