Operating Instructions
DigiTrak
®
F5
®
SST
®
Operator’s Manual
21
7. Connect and Power Up F5 SST Equipment
First, install the battery pack in the receiver, and then click the trigger to power it up. From the main menu,
go to the transmitter selection menu and select the cable option, and then the SST transmitter option.
Next, connect the remote display to the cable box and the cable box to the power source, as shown in the
following diagram. Then connect the SST transmitter to the amp meter and to the power post on the cable
box. You must ground the transmitter by connecting the negative terminal on the power source to the
metal end cap on the SST transmitter.
Press the execute button on the SST remote to power it up. From the main menu select the cable mode
option and press the execute button to enter cable mode.
Verify that you see data on the remote display and the receiver. If you do not, then recheck your
connections and try again or call DCI Customer Service for assistance.
Setup for SST Transmitter Power Up and Amp Reading
F5 SST
receiver
Battery
(12
–28V)
SST
transmitter
SST remote
display
Cable
box
At least
30 ft (9 m)
from SST
transmitter
to drill
10-gauge
white wire
Amp
meter
Drill
Ground
wire
White
wire
Black wire