MODEL BGS-250 GRINDER
SECTION 7
MAINTENANCE
41
Grinding & Polishing
OPERATING MANUAL
DECEMBER 2008
As previously mentioned in Section 5.1 Initial operation, we recommend
conducting initial repair work on the machine with the support of Diamatic
personnel, by taking this advice, maintenance personnel get the opportunity to be
trained by an expert on the machine.
If parts or components are to be replaced, the following sequence of
maintenance must be followed.
It is advisable to stock all spare or wear parts that cannot be obtained quickly. As
a rule, production standstill periods are more expensive than the cost for carrying
the corresponding spare part.
Screws that have been removed must be replaced with those of the same quality
(strength, material) and design.
7.3 REPAIRING