Remove and set aside the cover from
the Reference Bench pneumatic
interconnections box by removing the
four screws that hold it (see Figure 7).
Unwind the (4) 1/8 in. pneumatic lines
coming out of the interconnections box.
Connect the 1/4 in. stainless steel tube
labeled
FPG CNTL
to the inside of the
FPG CONTROL
port on the
interconnections box bulkhead. Before
tightening, orient the tube so that the
connection to the top port of valve 11 on
the FPG8601 can be made (see Section
3.3.4). Make the connection to valve 11.
Tighten both fittings.
Connect the 1/4 in.
stainless steel tube labeled
FPG TEST
to the 1/4 in. Swage open
port on valve 2 in the interconnections box. Before tightening, orient the tube so that
the KF16 connection to the FPG8601 high test port can be made(see Section 3.3.4).
Make the connection to the FPG high test port. Tighten the 1/4 in. Swage connection.
There is a 1/4 in. stainless steel tube
with a 1/4 in. Swage by DH200 M
adaptor installed coming out of the
interconnections box. Connect the
DH200 M end of the adaptor to the
TEST
port on the rear of the
PG7601 platform. The gland and
collar for the DH200M adaptor are
delivered in the
TEST
port. Be sure
both the Swage and swage DH200
M nuts are tight.
Install a DH200 stainless steel plug in
the
VACUUM
port on the rear of the
PG7601 platform. The gland for the
DH200M plug is delivered in the
TEST
port. No collar us used with a
plug.