background image

15

106573

OWNER’S MANUAL

VENTING
INSTALLATION

Continued

HIGH ALTITUDE
INSTALLATION

Your Vanguard direct-vent fireplace has
been AGA tested and approved for eleva-
tions from 0-2000 feet and CGA certified
for elevations from 0-4500 feet.

When installing this fireplace at an elevation
above 2000 feet (in the USA), you may need
to decrease the input rating by changing the
existing burner orifice to a smaller size. Re-
duce input 4% for each 1000 feet above sea
level. Check with your local gas company for
proper orifice size identification.

When installing this fireplace at an eleva-
tion above 4500 feet (in Canada), check
with local authorities.

Consult your local gas company to help de-
termine the proper orifice for your location.

For assistance with any high altitude instal-
lation contact DESA International’s Tech-
nical Service Department at 1-800-DESA-
LOG (1-800-337-2564).

PARTS LISTS FOR VENTING
KITS AND COMPONENTS

Vanguard Rigid Venting

Number Description

*CVK

Corner Vent Kit

Includes: 7" x 30º Elbow, 7" x 90º
Elbow, 7" Adjustable Galvanized
Pipe (7-12"), 6" Pipe, Wall
Thimble, Horizontal Termina-
tion, RTV Silicone and 20 Screws

*BVK

Basement Rigid Vent Kit

Includes: 7" x 30° Elbow, 7" x 4'
Galvanized Pipe, 7" x 90° El-
bow, 7" Adjustable Galvanized
Pipe (7-12"), Wall Thimble,
Horizontal Termination, RTV
Silicone and 20 Screws

Number Description

*SVK

Snorkel Rigid Vent Kit

Includes: 7" x 30° Elbow, 7" x 4'
Galvanized Pipe, 7" x 90° El-
bow, 7" Adjustable Galvanized
Pipe (7-12"), Wall Thimble, 36"
Snorkel Termination, RTV Sili-
cone and 28 Screws

*RVF

Roof Rigid Vent Kit

Includes: Flue Restrictor, Storm
Collar, 7" x 30° Elbow, 7" x 4'
Galvanized Pipe, 7" x 2' Galva-
nized Pipe, 7" Adjustable Gal-
vanized Pipe (7-12"), Firestop
Support, Roof Flashing, RTV
Silicone, Vertical Termination,
and 26 screws

D1000

7" x 12" Galvanized Coaxial
Pipe (6 pcs.)

D1010

7" x 24" Galvanized Coaxial
Pipe (6 pcs.)

D1020

7" x 48" Galvanized Coaxial
Pipe (6 pcs.)

D1030

7" Adjustable (7-12")
Galvanized Coaxial Pipe
(6 pcs.)

D1050

7" x 6" Galvanized Coaxial
Pipe (6 pcs.)

D2000

7" x 90° Elbow (6 pcs.)

D2010

7" x 45° Elbow (6 pcs.)

D2060

7" x 45° Starter Elbow

D3000

Wall Strap/Offset Support

(6 pcs.)

D3010

Storm Collar (6 pcs.)

D3020

Wall Thimble (6 pcs.)

D3050

Vertical Restrictor (6 pcs.)

D3060

Ceiling Firestop/Support
(6 pcs.)

D3070

Rectangular Horizontal Rigid
Vent Termination Cap

D3071

Adjustable Horizontal Rigid
Vent Termination Cap

D3090

Cathedral Ceiling Support
Box

D4000

Roof Flashing 6/12-9/12

D4010

Roof Flashing 9/12-12/12

D4020

Flex Connector (6 pcs.)

D4030

Flex Wall Thimble (6 pcs.)

D4040

4" Hose Clamp (6 pcs.)

D4050

7" Hose Clamp (6 pcs.)

D5000

Vinyl Siding Standoff (6 pcs.)

SIMPSON DURA-VENT
GS 4" x 6 

5

/

"

Number Description
902

7" x 48" Pipe

903

7" x 36" Pipe

904

7" x 24" Pipe

906

7" x 12" Pipe

907

7" x 9" Pipe

908

7" x 6" Pipe

911

7" Adjustable (11"-14 

5

/

8

") Pipe

940

Wall Thimble

941

Cathedral Ceiling Support Box

943

Roof Flashing 0/12-6/12

943S

Roof Flashing 7/12-12/12

945

7" x 45° Elbow

950

Vinyl Siding Standoff

953

Storm Collar

963

Ceiling Firestop

981

36" Snorkel Termination

984

Horizontal Termination Vent Cap

988

Wall Strap

990

7" x 90° Elbow

991

Vertical High Wind Termination

Vanguard Flexible Venting

Number Description

FGFVK

Flex Ground Floor Vent Kit

Includes: Flex Adapter, 7" x 4'
Flexible Pipe, 4" x 4' Flexible
Pipe, Wall Thimble, Horizontal
Termination, (4) Spacer Springs,
(2) 4" Hose Clamps, (2) 7" Hose
Clamps, RTV Silicone, and
10 Screws

D1040

7" x 25' Coaxial Flex Pipe
with Spacer Springs

D3080

Rectangular Horizontal
Flex Termination Cap

Vanguard Rigid Venting 

(Cont.)

*NOTICE: The 7" x 30° Elbow sup-
plied with kits CVK, BVK, SVK,
and RVF cannot be used. It MUST
be replaced with a 7" x 45º Starter
Elbow (D2060).

Summary of Contents for Vanguard EVDDVF36PN

Page 1: ...gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier SAVE...

Page 2: ...d Back of Surround Figure 2 EVDDVF36STN See Thru Dimensions Left Side Surround Right Side Surround Rating Plate Location Left Side Surround Right Side Surround GLOSSARY OF TERMS Chase A box like enclo...

Page 3: ...gas approved for use in this gas appliance NOTICE Check local building codes for area requirements be fore installing this appliance This appliance when installed must be elec trically grounded in ac...

Page 4: ...ock re quired air spaces with insula tion or any other material Do not obstruct the effective opening of the appliance with any type of facing material MANTEL CLEARANCES Woodwork such as wood trims ma...

Page 5: ...ting terminals into a wall or siding If installing on vinyl siding a vinyl sid ing standoff must be used see Figure 19 page 9 Install horizontal venting with a 1 4 rise for every 12 of run toward the...

Page 6: ...aved side walk or a paved driveway located on public property 84 inches 2133mm minimum M clearance under veranda porch deck 12 inches 305mm minimum N clearance above a roof shall extend a minimum of 2...

Page 7: ...t is important to select the proper length of vent pipe for the type of termination you choose It is also important to note the wall thickness For Horizontal Termination Select the amount of vertical...

Page 8: ...the appliance adaptor with pipe seams oriented towards the wall or floor Twist lock Procedure The female ends of the pipes and fittings have four locking lugs indentations These lugs will slide strai...

Page 9: ...of the vent cap Position the vent cap in the center of the 7 1 2 or 10 hole on the exterior wall with the arrow on the vent cap pointing up Insure proper clearance of 1 to combustibles is maintained...

Page 10: ...al V and Horizontal H maxi mums and minimums The same amounts apply for flexible venting FGFVK Vent Kit Shown Horizontal Termination Configurations Figures 21 through 23 show different con figurations...

Page 11: ...90 Elbows Vertical V Horizontal H1 Horizontal H2 5 min 4 max 6 min 8 max 7 min 10 max 8 min 15 max 20 max 20 max Figure 23 Horizontal Termination Configuration for Rigid Venting Using Two 90 Elbows w...

Page 12: ...ances air space to combustibles when passing through ceilings walls roofs enclo sures attic rafters etc Do not pack air spaces with insulation Also note maxi mum vertical rise of the venting sys tem a...

Page 13: ...ort box vertically and horizontally using a level Temporarily tack the support box in place through the inside walls and into the roof sheathing 4 Using tin snips cut the supportbox from the top corne...

Page 14: ...tion With No Horizontal Run VENTING INSTALLATION Continued Venting with Two 90 Elbows Vertical V1 Horizontal H 5 min 6 max 6 min 12 max 7 min 18 max 8 min 20 max Note Vertical V1 Vertical V2 20 max Fi...

Page 15: ...shing RTV Silicone Vertical Termination and 26 screws D1000 7 x 12 Galvanized Coaxial Pipe 6 pcs D1010 7 x 24 Galvanized Coaxial Pipe 6 pcs D1020 7 x 48 Galvanized Coaxial Pipe 6 pcs D1030 7 Adjustabl...

Page 16: ...he blower system will not flow properly WARNING Disconnect all electrical power to the fireplace Be careful of burrs and sharp edges BLOWER SPEED CONTROL INSTALLATION 1 Place speed control switch asse...

Page 17: ...em at test pressures equal to or less than 1 2 psig 3 5 kPa 1 Install a sediment trap between the in coming gas line and the gas control valve see Figure 40 The sediment trap should extend down the ce...

Page 18: ...to prevent damage to glass or refractory 1 Remove top and bottom louvers by si multaneously pulling both top end spring latches towards the center of the applianceuntiltheyaredisengagedfrom locating...

Page 19: ...d during shipping and han dling If this is the case some minor adjust ments may be necessary and should be done by a qualified technician To access the elec trode the glass door must be opened The pro...

Page 20: ...ng ignition Young children should be carefully supervised when they are in the same room as the appliance WARNING Have a qualified agency periodically inspect the vent system at the start of each heat...

Page 21: ...tes to clear out any gas Then smell for gas including near the floor If you smell gas STOP Follow B in the safety in formation in column one If you don t smell gas go to the next step 7 Turnequipments...

Page 22: ...iginalreplacementpart s call DESA International s Technical Ser vice Department at 1 800 323 5190 for re ferral information When calling DESA International have ready your name your address model and...

Page 23: ...Replace control valve see Replacement Parts page 27 5 Tighten wires or replace electrode 6 Check that the main power is on and that all wire connections are made correctly to the ignition module see W...

Page 24: ...oved from line Have gas line checked by local pro pane LP gas company 2 Clean burner or replace burner orifice 1 Adjust the log set so that the flame does not excessively impinge on it 2 Inspect the o...

Page 25: ...ss too loose and air tight gasket leaks in corners after usage 6 Improper vent cap installation 1 Gas leak See Warning statement above 1 Improper log placement 2 Air holes at burner inlet blocked 3 Bu...

Page 26: ...overplate andmillivoltwires are supplied with the appliance If wires need replacing use proper gauge Millivolt Wires Wall Switch and Cover Plate ORIFICE Natural 105890 01 27224 REPLACEMENT PARTS A A B...

Page 27: ...PARTS Continued Front Bottom Left Right Bottom Front Used for See Thru Only GRATE 105889 01 11184 DOOR ASSEMBLY Tempered 106923 01 27200 LOUVER KIT Black 105904 01 01627 END LOUVER KIT Peninsula Only...

Page 28: ...l be the responsibility of the owner TO THE FULL EXTENT ALLOWED BY THE LAW OF THE JURISDICTION THAT GOVERNS THE SALE OF THE PRODUCT THIS EXPRESS WARRANTY EXCLUDES ANY AND ALL OTHER EXPRESSED WARRANTIE...

Reviews: