FIRST START-UP PREPARATION
Before starting and testing warm air heaters, check that:
•
The protective film has been removed from the
heater walls.
•
The air guide-vane orientation has been adjusted
according to the position of the heater and to the
needs of the room.
Use adequate safety equipment (gloves etc.).
You must open the air deflectors before installation.
Open the deflectors by taking hold of the ends.
•
The heater is correctly positioned and the distances
around the heater have been respected (see page
12).
•
There is fuel available and the supply valves are
open.
•
The electrical connections to the supply and to the
components (burner, thermostats, etc) have been
made.
The phase - neutral connection must be absolutely
respected.
The earthing connection is obligatory.
21
Summary of Contents for BG 110
Page 30: ...PROSTOR PRO PŘÍPADNÉ POZNÁMKY 30 ...
Page 94: ...ESPACIO PARA EVENTUALES NOTAS 30 ...
Page 158: ...3 NOTES 30 ...
Page 190: ...2 SPAZIO PER EVENTUALI NOTE 29 30 ...
Page 222: ...MIEJSCE NA EWENTUALNE UWAGI 30 ...
Page 256: ...ПРИМЕЧАНИЯ 32 ...