ENGLISH
9
Operation and installation manual SOLIVIA 5.0 AP G3
319.5
150
320
200
6.5
12
Ø 12.5
90
38
12
410 ± 0.5
6.3
Maintenance
Make sure that the device remains uncovered while in operation. To avoid the casing of the solar
inverter becoming soiled, it should be cleaned periodically.
User serviceable parts are not contained in the device. Under no circumstances should the solar
inverter be opened!
6.4
Installation
You should utilize the delivered mounting plate for problem-free installation of the solar inverter.
Installation to the wall should be implemented with the proper screws. Mount the wall bracket so that
the solar inverter only has to be simply attached. After that, the device is to be bolted on securely.
Assembly instructions
1.
Mount the mounting plate with appropriate screws (max. Ø 6mm) into at least four of
the eight holes to fix the wall bracket in place. You can employ the mounting plate as a
template for marking the positions of the boreholes.
2.
As the solar inverter weighs 32.0 kg, it should be lifted out of the transport crate by at
least two persons.
3.
Place the solar inverter onto the mounting plate with at least two persons.
4.
Fasten the supplied mounting nuts and washers on the threaded bolt intended for secu-
ring the device.
5.
Check that the solar inverter is securely sealed.
Mounting
plate
Locking screw
Locking screw
Summary of Contents for SOLIVIA 5.0 AP G3
Page 1: ...Operation and installation manual for SOLIVIA 5 0 AP G3 5 0 AP...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 5 0 AP G3...
Page 38: ...36 SOLIVIA 5 0 AP G3...
Page 40: ...38 SOLIVIA 5 0 AP G3...
Page 42: ...40 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 AC 2 SOLIVIA 5 0 AP G3 9 18kg 5...
Page 43: ...41 SOLIVIA 5 0 AP G3 3 12 IP65 4 MPP 4 1 PC...
Page 44: ...42 SOLIVIA 5 0 AP G3 4 2 DC AC MPP MPP 150V 450V 540 VDC IP65 25 C 60 C RS485 EMC 4 6kVA...
Page 45: ...43 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED 1 4 5 2 3...
Page 53: ...51 SOLIVIA 5 0 AP G3 6 9 MPP DC DC DC DC DC A AC B C D 51 SOLIVIA 5 0 AP G3...
Page 68: ...66 SOLIVIA 5 0 AP G3 10 10 1 400 220V 400 230 V VNB Z 1 Z 2 1 2 400 220 V 400 230 V 4 6kVA...
Page 69: ...67 SOLIVIA 5 0 AP G3 400 220V 400 230 V VNB Z 1 Z 2 1 2 3 400 220 V 400 230 V 4 6kVA...
Page 71: ...69 SOLIVIA 5 0 AP G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 73: ...71 SOLIVIA 5 0 AP G3 RJ45 8 RJ Registered Jack RS485 EIA485 DC AC TAB 2000 TAB 2000 2000 DSO...
Page 74: ...72 SOLIVIA 5 0 AP G3...
Page 76: ...74 SOLIVIA 5 0 AP G3...
Page 78: ...76 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 18 5...
Page 79: ...77 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 MPP Tracking 150V 450V 540V IP65 25 C 60 C...
Page 80: ...78 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED RS485 EMC 4 6 kVA 4 3 1 4 5 2 3...
Page 88: ...86 SOLIVIA 5 0 AP G3 6 9 1 2 3 Wieland 4 5 6 7 UPV 150V 8 S Setup 7 3 7 6 9...
Page 103: ...101 SOLIVIA 5 0 AP G3 10 10 1 400 220 400 230 VNB Z 1 Z 2 1 2 400 220 400 230 4 6...
Page 104: ...102 SOLIVIA 5 0 AP G3 VNB Z 1 Z 2 Z 3 400 220 400 230 400 220 400 230 4 6 1 2 3...
Page 106: ...104 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 109: ...107 SOLIVIA 5 0 AP G3...
Page 110: ...108 SOLIVIA 5 0 AP G3...
Page 112: ...110 SOLIVIA 5 0 AP G3...
Page 115: ...113 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 150V 450V 540V IP65 25 C 60 C...
Page 116: ...114 SOLIVIA 5 0 AP G3 4 3 1 4 5 2 3 RS485 EMC 4 6 kVA 1 2 3 RS485 EIA485 4 5 LED...
Page 123: ...121 SOLIVIA 5 0 AP G3 6 9 121 SOLIVIA 5 0 AP G3...
Page 138: ...136 SOLIVIA 5 0 AP G3 10 10 1 Z 1 Z 2...
Page 139: ...137 SOLIVIA 5 0 AP G3 Z 1 Z 2 Z 3...
Page 140: ...138 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 kWh kWh...
Page 141: ...139 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3...
Page 143: ...141 SOLIVIA 5 0 AP G3 RJ45 RJ RS485 ELA485 TAB 2000 TAB 2000 TAB 2000 DSO...
Page 145: ...143...
Page 146: ...144...
Page 147: ......