Operation and installation manual SOLIVIA 5.0 AP G3
5
Installation
Installation and commissioning must only be carried out by qualified electrical experts.
The recommended local and national safety regulations and the technical interface conditions (TAB
2000), should be complied with.
To carry out an energy measurement, a meter must be attached between the grid feed-in point and
the solar inverter (in accordance with all local and national safety regulations).
By means of the integrated anti-islanding protection, the function of the recommended section
switch is fulfilled in accordance with all local and national safety regulations.
For details, please refer to § 9.
Caution: The secondary short-circuit current rating is increased at the transfer connection point to
the public electricity supply system by the nominal current of the connected solar inverter.
6
Installation of equipment
6.1
Installation location
• Install the device on a non-flammable support base.
• Avoid installation on resonating bodies (light construction walls etc.).
• Installation is possible both indoors and in protected outdoor areas.
• An increased ambient temperature can reduce the efficiency of the PV system.
• Noise generation is possible (avoid installation in residential areas).
• Ensure legibility of the LEDs and the display (check read-off angle and installation height).
• Although the unit is fitted with UV resistant components, direct exposure to sunlight should be
avoided.
• Despite having an IP65 enclosure and being certified in accordance with soiling category III, the
unit must not be allowed to become heavily soiled.
• Dusty conditions can impair the unit’s performance.
6.2
Minimum requirements
• Free convection around the solar inverter must not be impaired.
• For proper air circulation to dissipate heat, allow a clearance of approx. 10 cm to the side and
approx. 50 cm above and below the unit.
• The grid impedance requirement at the supply terminal is to be observed (cable length, cable
cross-section).
• The recommended installation position is to be adhered to (vertical).
• Unused DC connectors and interfaces must be sealed airtight with sealing plugs to ensure
protection class IP65 for the whole system (inverter & cables).
50 cm
10 cm
50 cm
10 cm
Wall
Wall
Summary of Contents for SOLIVIA 5.0 AP G3
Page 1: ...Operation and installation manual for SOLIVIA 5 0 AP G3 5 0 AP...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 5 0 AP G3...
Page 38: ...36 SOLIVIA 5 0 AP G3...
Page 40: ...38 SOLIVIA 5 0 AP G3...
Page 42: ...40 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 AC 2 SOLIVIA 5 0 AP G3 9 18kg 5...
Page 43: ...41 SOLIVIA 5 0 AP G3 3 12 IP65 4 MPP 4 1 PC...
Page 44: ...42 SOLIVIA 5 0 AP G3 4 2 DC AC MPP MPP 150V 450V 540 VDC IP65 25 C 60 C RS485 EMC 4 6kVA...
Page 45: ...43 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED 1 4 5 2 3...
Page 53: ...51 SOLIVIA 5 0 AP G3 6 9 MPP DC DC DC DC DC A AC B C D 51 SOLIVIA 5 0 AP G3...
Page 68: ...66 SOLIVIA 5 0 AP G3 10 10 1 400 220V 400 230 V VNB Z 1 Z 2 1 2 400 220 V 400 230 V 4 6kVA...
Page 69: ...67 SOLIVIA 5 0 AP G3 400 220V 400 230 V VNB Z 1 Z 2 1 2 3 400 220 V 400 230 V 4 6kVA...
Page 71: ...69 SOLIVIA 5 0 AP G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 73: ...71 SOLIVIA 5 0 AP G3 RJ45 8 RJ Registered Jack RS485 EIA485 DC AC TAB 2000 TAB 2000 2000 DSO...
Page 74: ...72 SOLIVIA 5 0 AP G3...
Page 76: ...74 SOLIVIA 5 0 AP G3...
Page 78: ...76 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 18 5...
Page 79: ...77 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 MPP Tracking 150V 450V 540V IP65 25 C 60 C...
Page 80: ...78 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED RS485 EMC 4 6 kVA 4 3 1 4 5 2 3...
Page 88: ...86 SOLIVIA 5 0 AP G3 6 9 1 2 3 Wieland 4 5 6 7 UPV 150V 8 S Setup 7 3 7 6 9...
Page 103: ...101 SOLIVIA 5 0 AP G3 10 10 1 400 220 400 230 VNB Z 1 Z 2 1 2 400 220 400 230 4 6...
Page 104: ...102 SOLIVIA 5 0 AP G3 VNB Z 1 Z 2 Z 3 400 220 400 230 400 220 400 230 4 6 1 2 3...
Page 106: ...104 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 109: ...107 SOLIVIA 5 0 AP G3...
Page 110: ...108 SOLIVIA 5 0 AP G3...
Page 112: ...110 SOLIVIA 5 0 AP G3...
Page 115: ...113 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 150V 450V 540V IP65 25 C 60 C...
Page 116: ...114 SOLIVIA 5 0 AP G3 4 3 1 4 5 2 3 RS485 EMC 4 6 kVA 1 2 3 RS485 EIA485 4 5 LED...
Page 123: ...121 SOLIVIA 5 0 AP G3 6 9 121 SOLIVIA 5 0 AP G3...
Page 138: ...136 SOLIVIA 5 0 AP G3 10 10 1 Z 1 Z 2...
Page 139: ...137 SOLIVIA 5 0 AP G3 Z 1 Z 2 Z 3...
Page 140: ...138 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 kWh kWh...
Page 141: ...139 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3...
Page 143: ...141 SOLIVIA 5 0 AP G3 RJ45 RJ RS485 ELA485 TAB 2000 TAB 2000 TAB 2000 DSO...
Page 145: ...143...
Page 146: ...144...
Page 147: ......