ENGLISH
11
Operation and installation manual SOLIVIA 5.0 AP G3
6.7
Connection of PV modules
Before the photovoltaic system is connected, the polarity of the PV voltage at the Multi-Contact con-
nectors must be checked to ensure that it is correct.
The connection of the PV module is implemented using Multi-Contact MC4 connectors, where the
DC negative pole is located on the connector upper row and the DC positive pole on the connector
lower row. The connectors are coded to prevent you from accidentally plugging them into the wrong
terminal.
Please ensure the following at all times:
• That there is never any risk of anyone coming into contact with the solar inverter connection
terminals, due to the risk of dangerous voltages across them.
• That under no circumstances are the PV modules to be disconnected from the solar inverter under
load. If a disconnection should be necessary, first switch the grid off so that the solar inverter
cannot absorb any further power. Next, open the upstream DC disconnector.
The maximum input voltage of the solar inverter is 540 V. The maximum current load of each indi-
vidual Multi-Contact MC4 connector is 18 A.
The solar inverter has an insulation and grounding monitoring on the DC side. The options can be
configured in the Setup menu “S -> Solar ISO / GND” (see § 7.3.7.1).
The insulation monitoring has two modes:
• ISO-ON-Error (the solar inverter is disconnected from the grid in the event of an insulation
fault)
• ISO-ON-Warning (the solar inverter indicates the fault but is not disconnected from the grid).
Deltas solar inverters are factory-set to ISO-ON-Warning mode on delivery.
The grounding monitoring has two modes:
• PV+ grounding (grounding monitoring of the positive pole of the PV generator)
• PV- grounding (grounding monitoring of the negative pole of the PV generator).
In these modes the solar inverter remains in feed-in operation and will not be disconnected from the
grid in case of a fault. The error message “PV+ grounding fault” or “PV- grounding fault” will appear
on the display.
If you need to connect the positive or negative pole of the PV system to meet requirements set
out by the module manufacturer, you can do this. Earth continuity must be implemented close to
the inverter. We suggest using Deltas grounding kit “Grounding Set A Solar” (EOE99000275). The
grounding connection is monitored and should be configured in the Setup menu (see above).
Alternatively, it is possible to turn off the insulation- and grounding monitoring:
• ISO / GND OFF.
Summary of Contents for SOLIVIA 5.0 AP G3
Page 1: ...Operation and installation manual for SOLIVIA 5 0 AP G3 5 0 AP...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 5 0 AP G3...
Page 38: ...36 SOLIVIA 5 0 AP G3...
Page 40: ...38 SOLIVIA 5 0 AP G3...
Page 42: ...40 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 AC 2 SOLIVIA 5 0 AP G3 9 18kg 5...
Page 43: ...41 SOLIVIA 5 0 AP G3 3 12 IP65 4 MPP 4 1 PC...
Page 44: ...42 SOLIVIA 5 0 AP G3 4 2 DC AC MPP MPP 150V 450V 540 VDC IP65 25 C 60 C RS485 EMC 4 6kVA...
Page 45: ...43 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED 1 4 5 2 3...
Page 53: ...51 SOLIVIA 5 0 AP G3 6 9 MPP DC DC DC DC DC A AC B C D 51 SOLIVIA 5 0 AP G3...
Page 68: ...66 SOLIVIA 5 0 AP G3 10 10 1 400 220V 400 230 V VNB Z 1 Z 2 1 2 400 220 V 400 230 V 4 6kVA...
Page 69: ...67 SOLIVIA 5 0 AP G3 400 220V 400 230 V VNB Z 1 Z 2 1 2 3 400 220 V 400 230 V 4 6kVA...
Page 71: ...69 SOLIVIA 5 0 AP G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 73: ...71 SOLIVIA 5 0 AP G3 RJ45 8 RJ Registered Jack RS485 EIA485 DC AC TAB 2000 TAB 2000 2000 DSO...
Page 74: ...72 SOLIVIA 5 0 AP G3...
Page 76: ...74 SOLIVIA 5 0 AP G3...
Page 78: ...76 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 18 5...
Page 79: ...77 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 MPP Tracking 150V 450V 540V IP65 25 C 60 C...
Page 80: ...78 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED RS485 EMC 4 6 kVA 4 3 1 4 5 2 3...
Page 88: ...86 SOLIVIA 5 0 AP G3 6 9 1 2 3 Wieland 4 5 6 7 UPV 150V 8 S Setup 7 3 7 6 9...
Page 103: ...101 SOLIVIA 5 0 AP G3 10 10 1 400 220 400 230 VNB Z 1 Z 2 1 2 400 220 400 230 4 6...
Page 104: ...102 SOLIVIA 5 0 AP G3 VNB Z 1 Z 2 Z 3 400 220 400 230 400 220 400 230 4 6 1 2 3...
Page 106: ...104 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 109: ...107 SOLIVIA 5 0 AP G3...
Page 110: ...108 SOLIVIA 5 0 AP G3...
Page 112: ...110 SOLIVIA 5 0 AP G3...
Page 115: ...113 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 150V 450V 540V IP65 25 C 60 C...
Page 116: ...114 SOLIVIA 5 0 AP G3 4 3 1 4 5 2 3 RS485 EMC 4 6 kVA 1 2 3 RS485 EIA485 4 5 LED...
Page 123: ...121 SOLIVIA 5 0 AP G3 6 9 121 SOLIVIA 5 0 AP G3...
Page 138: ...136 SOLIVIA 5 0 AP G3 10 10 1 Z 1 Z 2...
Page 139: ...137 SOLIVIA 5 0 AP G3 Z 1 Z 2 Z 3...
Page 140: ...138 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 kWh kWh...
Page 141: ...139 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3...
Page 143: ...141 SOLIVIA 5 0 AP G3 RJ45 RJ RS485 ELA485 TAB 2000 TAB 2000 TAB 2000 DSO...
Page 145: ...143...
Page 146: ...144...
Page 147: ......