24
Operation and installation manual SOLIVIA 5.0 AP G3
7.3.7
Submenu S (Setup)
This menu item is used for changing the presettings of the solar inverter.
Main menu S - Setup
S -> LCD-Contrast
0 ... 9
S -> LCD-Backlight
Auto / On
S -> Menu-Mode
Now ... Setup
S -> Cash per kWh Value
(AUD / Won) xx,xx
S -> ID-Number
001 ... 254
S -> Solar ISO / GND
S -> Baudrate
2400 ... 38400
Down
Down
Down
Down
Down
Down
Up
Up
Up
Up
Up
Down to 2
1
Up to 1
2
Submenu S - Setup
ESC
ESC
ESC
ESC
ESC
ESC
ESC
ENTER
Up
S -> Time (HH:MM:SS)
Down
ESC
Up
S -> Date
(WD.DD.MM.YYYY)
Down
ESC
Up
S -> Firmware
Down
ESC
Up
Adjustment of the firmware
Adjustment of the brightness of
the LCD display between 0 ... 9
Adjustment of the LCD
background lighting
Selection of the start menu
on restart of the device
Entry of feed-in remuneration in AUD / Won per kWh
Input of the ID number of the solar inverter
Adjustment of the baud rate
between 2400 ... 38400 Baud
Adjustment of the internal clock
Adjustment of current day of the week and date
ISO / GND Setup Menu
Summary of Contents for SOLIVIA 5.0 AP G3
Page 1: ...Operation and installation manual for SOLIVIA 5 0 AP G3 5 0 AP...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 5 0 AP G3...
Page 38: ...36 SOLIVIA 5 0 AP G3...
Page 40: ...38 SOLIVIA 5 0 AP G3...
Page 42: ...40 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 AC 2 SOLIVIA 5 0 AP G3 9 18kg 5...
Page 43: ...41 SOLIVIA 5 0 AP G3 3 12 IP65 4 MPP 4 1 PC...
Page 44: ...42 SOLIVIA 5 0 AP G3 4 2 DC AC MPP MPP 150V 450V 540 VDC IP65 25 C 60 C RS485 EMC 4 6kVA...
Page 45: ...43 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED 1 4 5 2 3...
Page 53: ...51 SOLIVIA 5 0 AP G3 6 9 MPP DC DC DC DC DC A AC B C D 51 SOLIVIA 5 0 AP G3...
Page 68: ...66 SOLIVIA 5 0 AP G3 10 10 1 400 220V 400 230 V VNB Z 1 Z 2 1 2 400 220 V 400 230 V 4 6kVA...
Page 69: ...67 SOLIVIA 5 0 AP G3 400 220V 400 230 V VNB Z 1 Z 2 1 2 3 400 220 V 400 230 V 4 6kVA...
Page 71: ...69 SOLIVIA 5 0 AP G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 73: ...71 SOLIVIA 5 0 AP G3 RJ45 8 RJ Registered Jack RS485 EIA485 DC AC TAB 2000 TAB 2000 2000 DSO...
Page 74: ...72 SOLIVIA 5 0 AP G3...
Page 76: ...74 SOLIVIA 5 0 AP G3...
Page 78: ...76 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 18 5...
Page 79: ...77 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 MPP Tracking 150V 450V 540V IP65 25 C 60 C...
Page 80: ...78 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED RS485 EMC 4 6 kVA 4 3 1 4 5 2 3...
Page 88: ...86 SOLIVIA 5 0 AP G3 6 9 1 2 3 Wieland 4 5 6 7 UPV 150V 8 S Setup 7 3 7 6 9...
Page 103: ...101 SOLIVIA 5 0 AP G3 10 10 1 400 220 400 230 VNB Z 1 Z 2 1 2 400 220 400 230 4 6...
Page 104: ...102 SOLIVIA 5 0 AP G3 VNB Z 1 Z 2 Z 3 400 220 400 230 400 220 400 230 4 6 1 2 3...
Page 106: ...104 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 109: ...107 SOLIVIA 5 0 AP G3...
Page 110: ...108 SOLIVIA 5 0 AP G3...
Page 112: ...110 SOLIVIA 5 0 AP G3...
Page 115: ...113 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 150V 450V 540V IP65 25 C 60 C...
Page 116: ...114 SOLIVIA 5 0 AP G3 4 3 1 4 5 2 3 RS485 EMC 4 6 kVA 1 2 3 RS485 EIA485 4 5 LED...
Page 123: ...121 SOLIVIA 5 0 AP G3 6 9 121 SOLIVIA 5 0 AP G3...
Page 138: ...136 SOLIVIA 5 0 AP G3 10 10 1 Z 1 Z 2...
Page 139: ...137 SOLIVIA 5 0 AP G3 Z 1 Z 2 Z 3...
Page 140: ...138 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 kWh kWh...
Page 141: ...139 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3...
Page 143: ...141 SOLIVIA 5 0 AP G3 RJ45 RJ RS485 ELA485 TAB 2000 TAB 2000 TAB 2000 DSO...
Page 145: ...143...
Page 146: ...144...
Page 147: ......