16
Operation and installation manual SOLIVIA 5.0 AP G3
In order to connect the device electrically, the following procedures must be followed:
1. DC connection: First, connect the PV module strings to the DC disconnector (not included in
the scope of delivery).
2. Connect the DC disconnector to the solar inverter (ensure correct polarity).
3. AC connection: Please install the Wieland AC mating connector to the AC output cable and then
put the AC connector to the solar inverter. Please make sure, that the sleeve nut is properly
fi xed and tighten.
4. Before switching on the power, check all feeders and connections one last time.
5. Close the DC disconnector.
6. Close the circuit breaker on the AC output side.
7. In case of suffi cient PV voltage (UPV > 150 V), the device now goes into the start-up mode.
8. In case of a new installation the time and date have to be set in sub-menu S (Setup) (see § 7.3.7).
All unoccupied connectors and interfaces must be sealed using the provided sealing
plugs.
6.10
Setup / settings
The default display language for solar inverters leaving the Delta factory is set to English.
After connecting to correct DC voltage and running through self-test, you will be asked to specify
the network ID and to select the desired country (countries available: China, India, Australia, Aus-
tralia PL
1)
and Thailand PEA).
The selection has to be confi rmed another time by the user. Once confi rmed, the network ID and
the country selection are stored to the controller memory – and the solar inverter is ready for
operation.
Please note that the enter keys on the display are locked, if there is no input entry within 5
minutes. To unlock the enter keys, you need to switch off the DC voltage and then switch it on
again.
1) In certain states in Australia, power limitation is required.
• With power limitation, the output (AC) power of SOLIVIA 5.0 AP G3 will be as followed :
Max power:
4990 W
Nominal power: 4600 W
• To activate power limitation, please select dedicated country “
Australia PL
” (Installed settings are password
protected):
Select unit ID = [1] & press <ENTER> key
Select country = [Australia PL] & press <ENTER> key
Confi rm country selection by pressing <ENTER> key
• The following label that is enclosed in the box of the inverter MUST be sticked next to the model label:
• To check if power limitation has been activated, please go to the menu S (Setup) and press the „UP“ or
„DOWN“ buttons to fi nd the following display message:
For Australia PL
This product has been power limited
at maximal output power of: 4.99 kW
Main menu S - Setup
S -> LCD-Contrast
0 ... 9
S -> LCD-Backlight
Auto / On
S -> Menu-Mode
Now ... Setup
S -> Cash per kWh Value
(AUD / Won) xx,xx
S -> ID-Number
001 ... 254
S -> Solar ISO / GND
S -> Baudrate
2400 ... 38400
Down
Down
Down
Down
Down
Down
Up
Up
Up
Up
Up
Down to 2
1
Up to 1
2
Submenu S - Setup
ESC
ESC
ESC
ESC
ESC
ESC
ESC
ENTER
Up
S -> Time (HH:MM:SS)
Down
ESC
Up
S -> Date
(WD.DD.MM.YYYY)
Down
ESC
Up
S -> Firmware AU L
Down
ESC
Up
Adjustment of the firmware
Adjustment of the brightness of
the LCD display between 0 ... 9
Adjustment of the LCD
background lighting
Selection of the start menu
on restart of the device
Entry of feed-in remuneration in AUD / Won per kWh
Input of the ID number of the solar inverter
Adjustment of the baud rate
between 2400 ... 38400 Baud
Adjustment of the internal clock
Adjustment of current day of the week and date
ISO / GND Setup Menu
AU
stralia
L
imitation
Summary of Contents for SOLIVIA 5.0 AP G3
Page 1: ...Operation and installation manual for SOLIVIA 5 0 AP G3 5 0 AP...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 5 0 AP G3...
Page 38: ...36 SOLIVIA 5 0 AP G3...
Page 40: ...38 SOLIVIA 5 0 AP G3...
Page 42: ...40 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 AC 2 SOLIVIA 5 0 AP G3 9 18kg 5...
Page 43: ...41 SOLIVIA 5 0 AP G3 3 12 IP65 4 MPP 4 1 PC...
Page 44: ...42 SOLIVIA 5 0 AP G3 4 2 DC AC MPP MPP 150V 450V 540 VDC IP65 25 C 60 C RS485 EMC 4 6kVA...
Page 45: ...43 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED 1 4 5 2 3...
Page 53: ...51 SOLIVIA 5 0 AP G3 6 9 MPP DC DC DC DC DC A AC B C D 51 SOLIVIA 5 0 AP G3...
Page 68: ...66 SOLIVIA 5 0 AP G3 10 10 1 400 220V 400 230 V VNB Z 1 Z 2 1 2 400 220 V 400 230 V 4 6kVA...
Page 69: ...67 SOLIVIA 5 0 AP G3 400 220V 400 230 V VNB Z 1 Z 2 1 2 3 400 220 V 400 230 V 4 6kVA...
Page 71: ...69 SOLIVIA 5 0 AP G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 73: ...71 SOLIVIA 5 0 AP G3 RJ45 8 RJ Registered Jack RS485 EIA485 DC AC TAB 2000 TAB 2000 2000 DSO...
Page 74: ...72 SOLIVIA 5 0 AP G3...
Page 76: ...74 SOLIVIA 5 0 AP G3...
Page 78: ...76 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 18 5...
Page 79: ...77 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 MPP Tracking 150V 450V 540V IP65 25 C 60 C...
Page 80: ...78 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED RS485 EMC 4 6 kVA 4 3 1 4 5 2 3...
Page 88: ...86 SOLIVIA 5 0 AP G3 6 9 1 2 3 Wieland 4 5 6 7 UPV 150V 8 S Setup 7 3 7 6 9...
Page 103: ...101 SOLIVIA 5 0 AP G3 10 10 1 400 220 400 230 VNB Z 1 Z 2 1 2 400 220 400 230 4 6...
Page 104: ...102 SOLIVIA 5 0 AP G3 VNB Z 1 Z 2 Z 3 400 220 400 230 400 220 400 230 4 6 1 2 3...
Page 106: ...104 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 109: ...107 SOLIVIA 5 0 AP G3...
Page 110: ...108 SOLIVIA 5 0 AP G3...
Page 112: ...110 SOLIVIA 5 0 AP G3...
Page 115: ...113 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 150V 450V 540V IP65 25 C 60 C...
Page 116: ...114 SOLIVIA 5 0 AP G3 4 3 1 4 5 2 3 RS485 EMC 4 6 kVA 1 2 3 RS485 EIA485 4 5 LED...
Page 123: ...121 SOLIVIA 5 0 AP G3 6 9 121 SOLIVIA 5 0 AP G3...
Page 138: ...136 SOLIVIA 5 0 AP G3 10 10 1 Z 1 Z 2...
Page 139: ...137 SOLIVIA 5 0 AP G3 Z 1 Z 2 Z 3...
Page 140: ...138 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 kWh kWh...
Page 141: ...139 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3...
Page 143: ...141 SOLIVIA 5 0 AP G3 RJ45 RJ RS485 ELA485 TAB 2000 TAB 2000 TAB 2000 DSO...
Page 145: ...143...
Page 146: ...144...
Page 147: ......